Jackson Hole, Wyoming Environmental Restoration Feasibility Report. Volume 2. Appendixes C-I

Jackson Hole, Wyoming Environmental Restoration Feasibility Report. Volume 2. Appendixes C-I

Author:

Publisher:

Published: 2000-07-01

Total Pages: 562

ISBN-13: 9781423531289

DOWNLOAD EBOOK

In the early 1990's concerns were raised by residence in the Westbank area. At that time, there was basically no documentation of ground water elevations in the area. The Wyoming State Engineer's Office and the Teton County Commission initiated the Observation Well System north of f Highway 22 and west of the Snake River channel which included thirty (30) wells. Additionally, the Teton County Resource District through a co-op arrangement with the USGS installed a surface water gauging system. The Wyoming State Engineer's Office Surface Water Division installed a more expanded gauging system that monitored additional stream sites as well an irrigation diversions. In 1997, the Wyoming State Engineer's Office Ground Water Division in co-operation with the Teton County Commission installed an additional twelve (12) observation wells south of Hwy. 22 and west of the Snake River channel. This completed the system as it exist today with the exception of the eight (8) reference wells located along the east bank of the Snake River channel, bringing the total number of wells to fifty (50). The purpose of this appendix is to provide technical support in the area of ground water elevations within the study area that could be affected by restoration measures. The Monitoring System targets the area down gradient of Study Sites 10, 9, 4, and 1 on the Westbank of the Snake River.


Jackson Hole, Wyoming Environmental Restoration Draft Feasibility Study Volume 1 Draft Feasibility Study and Appendixes A - B

Jackson Hole, Wyoming Environmental Restoration Draft Feasibility Study Volume 1 Draft Feasibility Study and Appendixes A - B

Author:

Publisher:

Published: 2000-04-01

Total Pages: 561

ISBN-13: 9781423531296

DOWNLOAD EBOOK

The Jackson Hole, Wyoming, Environmental Restoration Feasibility Report Draft April 200015 the draft product of a 4-year, cost sharing feasibility study conducted by the U.S. Army Corps of Engineers, Walla Walla District, in partnership with Teton County, Wyoming, and Teton Conservation District, Wyoming. The report recommends an environmental restoration project on a 22-mile reach of the upper Snake River from Grand Teton National Park to South Park Elk Feedgrounds. The goal of the recommended project is to restore diverse and sustainable aquatic, wetland, riverside, and terrestrial habitats within the study area. If you would like additional of the final version of the report copies (free of charge until no longer available), please contact, Mr. Stan Heller, Project Manager, U.S. Army Corps of Engineers, 201 North Third Avenue, Walla Walla, Washington 99362 (or send e-mail to: Stanley.G.Hellernww01.usace. army.mil.or telephone at 509-527-7258). The EA (Appendix H) of the report is also available at website: http://www.nwwusace.army.mil/reports/jackson.


Jackson Hole, Wyoming Environmental Restoration Draft Feasibility Study. Appendixes C-I

Jackson Hole, Wyoming Environmental Restoration Draft Feasibility Study. Appendixes C-I

Author:

Publisher:

Published: 2000-04-01

Total Pages: 515

ISBN-13: 9781423531364

DOWNLOAD EBOOK

The Jackson Hole, Wyoming, Environmental Restoration Feasibility Report Draft April 2000 is the draft product of a 4-year, cost sharing feasibility study conducted by the U.S. Army Corps of Engineers, Walla Walla District, in partnership with Teton County, Wyoming, and Teton Conservation District, Wyoming. The report recommends an environmental restoration project on a 22-mile reach of the upper Snake River from Grand Teton National Park to South Park Elk Feedgrounds. The goal of the recommended project is to restore diverse and sustainable aquatic, wetland, riverside, and terrestrial habitats within the study area. If you would like additional copies of the final version of the report (free of charge until no longer available), please contact, Mr. Stan Heller, Project Manager, U.S. Army Corps of Engineers, 201 North Third Avenue, Walla Walla, Washington 99362 (or send e-mail to: Stanley.G.Hellernww01 .usace. army.mil or telephone at 509-527-7258). The EA (Appendix H) of the report is also available at website: http://www. nwwusace.army. mil/reports/jackson.


Jackson Hole, Wyoming Environmental Restoration Feasibility Report. Feasibility Report and Appendixes A-B

Jackson Hole, Wyoming Environmental Restoration Feasibility Report. Feasibility Report and Appendixes A-B

Author:

Publisher:

Published: 2000-07-01

Total Pages: 557

ISBN-13: 9781423531272

DOWNLOAD EBOOK

In 1990, the U.S. Congress authorized the U.S. Army Corps of Engineers (Corps) to conduct the Jackson Hole, Wyoming, Environmental Restoration Feasibility Study (Feasibility Study) through the General Investigations Program. The purpose of the study was to investigate the feasibility of restoring fish and wildlife habitat that was lost as a result of construction, operation, and maintenance of the Jackson Hole Flood Control Project levees completed in 1964. The study area is located in and along the Snake River near Jackson, Wyoming, in Teton County See plates 1 and 2 in the Jackson Hole, Wyoming, Environmental Restoration Feasibility Report (Feasibility Report) for vicinity and project location maps. The primary local sponsor is Teton County, Wyoming. The study area borders the National Elk Refuge and is in close proximity to Grand Teton and Yellowstone National Parks.


Stream Corridor Restoration

Stream Corridor Restoration

Author:

Publisher: National Technical Info Svc

Published: 1998

Total Pages: 648

ISBN-13:

DOWNLOAD EBOOK

This document is a cooperative effort among fifteen Federal agencies and partners to produce a common reference on stream corridor restoration. It responds to a growing national and international interest in restoring stream corridors.


Jackson Hole, Wyoming Environmental Restoration Draft Feasibility Study and Environmental Assessment

Jackson Hole, Wyoming Environmental Restoration Draft Feasibility Study and Environmental Assessment

Author:

Publisher:

Published: 2000-04-01

Total Pages: 478

ISBN-13: 9781423531258

DOWNLOAD EBOOK

The Jackson Hole, Wyoming, Environmental Restoration Feasibility Report Draft April 2000 is the draft product of a 4-year, cost sharing feasibility study conducted by the U.S. Army Corps of Engineers, Walla Walla District, in partnership with Teton County, Wyoming, and Teton Conservation District, Wyoming. The report recommends an environmental restoration project on a 22-mile reach of the upper Snake River from Grand Teton National Park to South Park Elk Feedgrounds. The goal of the recommended project is to restore diverse and sustainable aquatic, wetland, riverside, and terrestrial habitats within the study area. If you would like additional of the final version of the report copies (free of charge until no longer available), please contact, Mr. Stan Heller, Project Manager, U.S. Army Corps of Engineers, 201 North Third Avenue, Walla Walla, Washington 99362 (or send e-mail to: Stanley.G.Hellernww01.usace. army.mil or telephone at 509-527-7258). The EA (Appendix H) of the report is also available at website: http://www. nwwusace.army.mil/reports/jackson.