High Flux Isotope Reactor Quarterly Report, July, August, and September of 1976

High Flux Isotope Reactor Quarterly Report, July, August, and September of 1976

Author:

Publisher:

Published: 1977

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

An extended shutdown to replace part of the beryllium reflector reduced the operating time for the quarter to 88 percent and the operating time for the year to 92.9 percent. The semiannual reactor component inspection was completed and the control plates were changed. Basic operating data for the quarter are listed.