The Umatilla River Vision

The Umatilla River Vision

Author: Krista L. Jones

Publisher:

Published: 2011

Total Pages: 32

ISBN-13:

DOWNLOAD EBOOK

"In this report, we outline a vision for desired ecological characteristics of the Umatilla River's water quality and water resource management, which will facilitate the sustained production of First Foods within the Umatilla Basin. These characteristics are founded on five fundamental "touchstones," including: 1) hydrology, 2) geomorphology, 3) connectivity, 4) native riparian vegetation, and 5) native aquatic biota. The First Foods management framework adopts a broad definition of "water quality," incorporating the physical, chemical, biological, and ecological targets to assess the quality of water in the Umatilla River. Essentially, according to this framework, the ecological function and health of the Umatilla River become a holistic measure of water quality, and provide a pathway toward the restoration and maintenance of First Foods production."--From introduction (page 1).


Umatilla Basin Natural Production Monitoring and Evaluation ; 1992-1993 Annual Report

Umatilla Basin Natural Production Monitoring and Evaluation ; 1992-1993 Annual Report

Author:

Publisher:

Published: 1994

Total Pages: 120

ISBN-13:

DOWNLOAD EBOOK

This report summarizes the activities of the Umatilla Basin Natural Production Monitoring and Evaluation Project from September 30, 1992 to September 29, 1993. Examinations of historical flow and water temperature records and current physical habitat, indicate that the streams in the Umatilla River Basin vary in condition from extremely poor to good. Reduced flows and high water temperatures prevented salmonid production in the lower Umatilla River below river mile 75 during the summer and early fall. This was also true in the lower reaches of many tributaries. Isolated springs provided limited refuges in the mid Umatilla River and lower Meacham Creek. Suitable habitat for salmonids was found in the upper reaches of the mainstem and tributaries.


Umatilla Basin Natural Production Monitoring and Evaluation; 1998-2002 Summary Report

Umatilla Basin Natural Production Monitoring and Evaluation; 1998-2002 Summary Report

Author: Craig R. Contor

Publisher:

Published: 2004

Total Pages: 294

ISBN-13:

DOWNLOAD EBOOK

The Umatilla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPME). Chapter One provides an overview of the entire report and shows how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. This chapter also provides background information relevant to the aquatic resources of the Umatilla River Basin. (Figure 1-1, Tables 1-1 and 1-2). Data and reports from this and previous efforts are available on the CTUIR website http://www.umatilla.nsn.us. This project was one of several subprojects of the Umatilla River Basin Fisheries Restoration Master Plan (CTUIR 1984, ODFW 1986) orchestrated to rehabilitate salmon and steelhead runs in the Umatilla River Basin. Subprojects in additions to this project include: Watershed Enhancement and Rehabilitation; Hatchery Construction and Operation; Hatchery Monitoring and Evaluation; Satellite Facility Construction and Operations for Juvenile Acclimation and Adult Holding and Spawning; Fish Passage Construction and Operation; Juvenile and Adult Passage Facility Evaluations; Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Basin, and Flow Augmentation to Increase Stream Flows below Irrigation Diversions.


Umatilla Basin Natural Production Monitoring and Evaluation ; 1995-1996 Annual Report

Umatilla Basin Natural Production Monitoring and Evaluation ; 1995-1996 Annual Report

Author:

Publisher:

Published: 1997

Total Pages: 131

ISBN-13:

DOWNLOAD EBOOK

This report summarizes the activities of the Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPME) from September 30, 1995 to September 29, 1996. This program was funded by Bonneville Power Administration and was managed under the Fisheries Program, Department of Natural Resources, Confederated Tribes of the Umatilla Indian Reservation. The goal was to evaluate the implementation of the Umatilla River Basin fisheries restoration plan with respect to natural production, adult passage, and tribal harvest. An estimated 56.1 river miles (RM) of habitat was inventoried on the lower Umatilla River (RM 0--56.1) from June 4, to August 1, 1996. The majority of the lower River was found to be too polluted and physically altered to provide suitable rearing or migration habitat for salmonids during the summer. High water temperatures, irrigation withdrawals, altered channels, and urban and agricultural pollution all contributed to degrade the lower Umatilla River. Small springs provided cooler waters and created small areas that were suitable for salmonid rearing. The river below the mouth of Mckay Creek (RM 27.2 to 50.6) was also cooler and more suitable to salmonid rearing when water was released from Mckay Dam. Two hundred sixty-three of 1,832 (14.4%) habitat units were electrofished from June 19 to August 29, 1996. The number of natural juvenile salmonids captured between RM 1.5--52.4 follow: (1) 141 juvenile steelhead (including resident rainbow trout; Oncoryhnchus mykiss), (2) 13 mountain whitefish (Prosopium williamsoni, including adults), (3) four chinook salmon (O. tshawytscha), and (4) two coho salmon (O. kisutch). The expanded population estimate for the areas surveyed was 2,445 salmonids. Mean density was 0.147 salmonids/100 square meter. Mean density of fast water habitat types was 4.5 times higher than slow water types (0.358 and 0.079 s/100 m2).