Transit Operations Plans Report

Transit Operations Plans Report

Author: Manuel Padron & Associates

Publisher:

Published: 1999

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

"This report describes proposed bus and LRT operations plans for the Southeast Corridor project. The bus and rail operations plans support the alternatives that are required to be carried forward in the PE/EIS phase of the project. The alternatives consists of a No-Biuld, TSM and LRT Build Alternative."--Introduction.


O&M Cost Methodology and Results Report

O&M Cost Methodology and Results Report

Author: Manuel Padron & Associates

Publisher:

Published: 1999

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

"This project is a continuation fo the Major Transportation Investment Study that was completed in 1996. Light rail transit (LRT) was selected in the MIS as the Locally Preferred Alternative (LPA). The LPA alignment follows the west side of I-25 from I-25/Broadway to Lincoln Avenue, with a spur alignment in the median of I-225 from Parker Road to I-25."--Introduction.