Proceedings of the Ship Production Symposium Held in Williamsburg, Virginia on November 1-4, 1993

Proceedings of the Ship Production Symposium Held in Williamsburg, Virginia on November 1-4, 1993

Author:

Publisher:

Published: 1993

Total Pages: 308

ISBN-13:

DOWNLOAD EBOOK

This volume contains the texts of the twenty-five technical papers presented during the National Shipbuilding Research Program 1993 SHIP PRODUCTION SYMPOSIUM, sponsored by the Hampton Roads Section of the Society of Naval Architects and Marine Engineers (SNAME) The Symposium was held at the Williamsburg Lodge in Colonial Williamsburg, Virginia, from November 1-4, 1993. This marks the second time the Hampton Roads Section of SNAME has hosted the Symposium in Williamsburg. The Symposium theme was "Keys to Successful Shipbuilding-Quality, Productivity and Delivery. The mission of the National Shipbuilding Research Program is to assist the U.S. Shipbuilding and Repair Industry in achieving and maintaining global competitiveness concerning quality, time, cost and customer satisfaction. The specific goals for the 1990's are; reduce construction and repair process times while reducing cost to design, build and repair skips; promote a commitment to quality and customer satisfaction; obtain a three percent share of the global shipbuilding market and to become the nationally recognized forum to advance shipbuilding and skip repair technology. The technical papers presented during the 1993 SHIP PRODUCTION SYMPOSIUM covered a diversity of topics which supported this year's theme and will affect schedules and costs dramatically over the next decade.


The National Shipbuilding Research Program. 1993 Ship Production Symposium. Paper No. 8: Network Scheduling Development in an MRP II Environment

The National Shipbuilding Research Program. 1993 Ship Production Symposium. Paper No. 8: Network Scheduling Development in an MRP II Environment

Author:

Publisher:

Published: 1993

Total Pages: 18

ISBN-13:

DOWNLOAD EBOOK

Large manufacturing industries have been able to successfully reduce cost and cycle time through the use of Manufacturing Resource Planning (MRP II) systems and principles to control material flow and the production process. Ship construction can not be neatly classified as a manufacturing process. The complex relationships involved with the installation and activation of ship's systems more closely resembles a construction operation. Work of this type has traditionally been controlled through an activity based network scheduling system. However, MRP 11 principles offer numerous benefits for the shipbuilding industry. This paper discusses an approach to planning, scheduling, and management of ship construction which takes advantage of benefits from both approaches. By using both network scheduling and MRP II in an integrated scheduling system, a shipyard will be better able to plan and execute the ship construction process.


The Natiional Shipbuilding Research Program. 1993 Ship Production Symposium. Paper No. 8: Network Scheduling Development in an MRP II Environment

The Natiional Shipbuilding Research Program. 1993 Ship Production Symposium. Paper No. 8: Network Scheduling Development in an MRP II Environment

Author:

Publisher:

Published: 1993

Total Pages: 18

ISBN-13:

DOWNLOAD EBOOK

Large manufacturing industries have been able to successfully reduce cost and cycle time through the use of Manufacturing Resource Planning (MRP II) systems and principles to control material flow and the production process. Ship construction can not be neatly classified as a manufacturing process. The complex relationships involved with the installation and activation of ship's systems more closely resembles a construction operation. Work of this type has traditionally been controlled through an activity based network scheduling system. However, MRP 11 principles offer numerous benefits for the shipbuilding industry. This paper discusses an approach to planning, scheduling, and management of ship construction which takes advantage of benefits from both approaches. By using both network scheduling and MRP II in an integrated scheduling system, a shipyard will be better able to plan and execute the ship construction process.


SSC.

SSC.

Author: United States. Ship Structure Committee

Publisher:

Published: 1994

Total Pages: 242

ISBN-13:

DOWNLOAD EBOOK