Schultz-Hanford Area Transmission Line Project
Author:
Publisher:
Published: 2003
Total Pages: 378
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author:
Publisher:
Published: 2003
Total Pages: 378
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2002
Total Pages: 35
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2002
Total Pages: 5
ISBN-13:
DOWNLOAD EBOOKThis summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.
Author:
Publisher:
Published: 2002
Total Pages: 35
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2002
Total Pages: 524
ISBN-13:
DOWNLOAD EBOOKAuthor: United States. Office of the Assistant Secretary of the Army (Civil Works)
Publisher:
Published: 2014
Total Pages: 1314
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2003
Total Pages: 598
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2003
Total Pages: 314
ISBN-13:
DOWNLOAD EBOOK