Reliable Replacement Warhead Program

Reliable Replacement Warhead Program

Author: Jonathan Medalia

Publisher: DIANE Publishing

Published: 2011-04

Total Pages: 49

ISBN-13: 1437938310

DOWNLOAD EBOOK

Most current U.S. nuclear warheads were built in the 1970s and 1980s and are being retained longer than was planned. Yet they deteriorate and must be maintained. To correct problems, a Life Extension Program (LEP) replaces components. Modifying some components would require a nuclear test, but the U.S. has observed a test moratorium since 1992. The NNSA and the DoE, would develop the Reliable Replacement Warhead (RRW). Contents of this report (1) Need to Maintain Nuclear Warheads for the Long Term; The Solution So Far: Is LEP Satisfactory for the Long Term?; RRW and the Transformation of Nuclear Warheads; (2) RRW Program Developments; (3) Congressional Action; (4) Chronology, 2007-. A print on demand report.


The Reliable Replacement Warhead Program: Background and Current Developments

The Reliable Replacement Warhead Program: Background and Current Developments

Author:

Publisher:

Published: 2009

Total Pages: 50

ISBN-13:

DOWNLOAD EBOOK

Most current U.S. nuclear warheads were built in the 1970s and 1980s and are being retained longer than was planned. Yet they deteriorate and must be maintained. To correct problems, a Life Extension Program (LEP), part of a larger Stockpile Stewardship Program (SSP), replaces components. Modifying some components would require a nuclear test, but the United States has observed a test moratorium since 1992. Congress and the Administration prefer to avoid a return to testing, so LEP rebuilds these components as closely as possible to original specifications. With this approach, the Secretaries of Defense and Energy have certified stockpile safety and reliability for the past 12 years without nuclear testing. NNSA argues it will become harder to certify current warheads with LEP because small changes may undermine confidence in warheads, perhaps leading to nuclear testing, whereas new-design replacement warheads created by the RRW program will be easier to certify without testing. Critics believe LEP and SSP can maintain the stockpile indefinitely. They worry that untested RRWs may make testing more likely and question cost savings, given high investment cost. They note that there are no military requirements for new weapons. Others feel that neither LEP nor RRW can provide high confidence over the long term, and would resume testing. Another point of view is that either LEP or RRW will work without nuclear testing. This report provides background and tracks legislation. It will be updated to reflect final FY2010 congressional action on RRW. See also CRS Report RL33748, Nuclear Warheads: The Reliable Replacement Warhead Program and the Life Extension Program, by Jonathan Medalia, which compares these two programs in detail.


The Reliable Replacement Warhead Program

The Reliable Replacement Warhead Program

Author: Jonathan Medalia

Publisher:

Published: 2007

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

This report discusses program to maintain nuclear warheads, a Life Extension Program (LEP), part of a larger Stockpile Stewardship Program (SSP).


The Reliable Replacement Warhead Program: Background and Current Developments

The Reliable Replacement Warhead Program: Background and Current Developments

Author:

Publisher:

Published: 2009

Total Pages: 50

ISBN-13:

DOWNLOAD EBOOK

Most current U.S. nuclear warheads were built in the 1970s and 1980s and are being retained longer than was planned. Yet they deteriorate and must be maintained. To correct problems, a Life Extension Program (LEP), part of a larger Stockpile Stewardship Program (SSP), replaces components. Modifying some components would require a nuclear test, but the United States has observed a test moratorium since 1992. Congress and the Administration prefer to avoid a return to testing, so LEP rebuilds these components as closely as possible to original specifications. With this approach, the Secretaries of Defense and Energy have certified stockpile safety and reliability for the past 12 years without nuclear testing. NNSA argues it will become harder to certify current warheads with LEP because small changes may undermine confidence in warheads, perhaps leading to nuclear testing, whereas new-design replacement warheads created by the RRW program will be easier to certify without testing. Critics believe LEP and SSP can maintain the stockpile indefinitely. They worry that untested RRWs may make testing more likely and question cost savings, given high investment cost. They note that there are no military requirements for new weapons. Others feel that neither LEP nor RRW can provide high confidence over the long term, and would resume testing. Another point of view is that either LEP or RRW will work without nuclear testing. This report provides background and tracks legislation. It will be updated to reflect final FY2010 congressional action on RRW. See also CRS Report RL33748, Nuclear Warheads: The Reliable Replacement Warhead Program and the Life Extension Program, by Jonathan Medalia, which compares these two programs in detail.


United States Statutes at Large

United States Statutes at Large

Author: United States

Publisher:

Published: 2010

Total Pages: 1602

ISBN-13:

DOWNLOAD EBOOK

Volumes for 1950-19 contained treaties and international agreements issued by the Secretary of State as United States treaties and other international agreements.