Project Management of Environmental Permitting Requirements for Civil Works Projects, US Army Corps of Engineers
Author: René Roger Leblanc
Publisher:
Published: 1990
Total Pages: 230
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author: René Roger Leblanc
Publisher:
Published: 1990
Total Pages: 230
ISBN-13:
DOWNLOAD EBOOKAuthor: U.S. Army Engineer Institute for Water Resources
Publisher:
Published: 1970
Total Pages: 32
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher: DIANE Publishing
Published:
Total Pages: 48
ISBN-13: 1428912037
DOWNLOAD EBOOKAuthor: Nicole T. Carter
Publisher: DIANE Publishing
Published: 2011
Total Pages: 18
ISBN-13: 143793823X
DOWNLOAD EBOOKThis is a print on demand edition of a hard to find publication. The U.S. Army Corps of Engineers¿s civil works projects can provide economic benefits in addition to their water resource development purposes. The primary missions of the Corps are creating and maintaining navigable channels, reducing flood and storm damage, and restoring aquatic ecosystems. Congress directs the agency through authorizations, appropriations, and oversight of studies, construction projects, and other activities. This report gives an overview of Corps congressional authorization and appropriations processes. It also explains the Corps project development process, as well as other agency activities under general authorities (e.g., repair of damaged levees). Evolution of the Army Corps Civil Works Mission. Illus.
Author: Claudia Copeland
Publisher: DIANE Publishing
Published: 2011-08
Total Pages: 24
ISBN-13: 1437985122
DOWNLOAD EBOOKACE permits authorize various types of development projects in wetlands and other waters of the U.S. The Corps¿ regulatory process involves two types of permits: general permits for actions by private landowners and will likely have a minor effect on wetlands, and individual permits for more significant actions. Contents of this report: (1) Intro.; (2) Background: Nationwide Permits: 1977-2007; Permit Reissuance in 2007; (3) Critiques: Mitigation Requirements; Coal Mining Activities; Fills Within the 100-Year Floodplain; Regional Conditioning; State Coordination Issues; Defining Minimal Adverse Effects, Assessing Cumulative Impacts; Recent Admin. Activity Concerning the Surface Coal Mining NWP. This is a print on demand report.
Author: United States. General Accounting Office
Publisher:
Published: 1990
Total Pages: 48
ISBN-13:
DOWNLOAD EBOOKAuthor: Thomas M. Clement
Publisher:
Published: 1971
Total Pages: 426
ISBN-13:
DOWNLOAD EBOOKAuthor: National Research Council
Publisher: National Academies Press
Published: 1999-03-29
Total Pages: 121
ISBN-13: 030917404X
DOWNLOAD EBOOKThe U.S. Army Corps of Engineers has long been one of the federal government's key agencies in planning the uses of the nation's waterways and water resources. Though responsible for a range of water-related programs, the Corps's two traditional programs have been flood damage reduction and navigation enhancement. The water resource needs of the nation, however, have for decades been shifting away from engineered control of watersheds toward restoration of ecosystem services and natural hydrologic variability. In response to these shifting needs, legislation was enacted in 1990 which initiated the Corps's involvement in ecological restoration, which is now on par with the Corps's traditional flood damage reduction and navigation roles. This book provides an analysis of the Corps's efforts in ecological restoration, and provides broader recommendations on how the corps might streamline their planning process. It also assesses the impacts of federal legislation on the Corps planning and projects, and provides recommendations on how relevant federal policies might be altered in order to improve Corps planning. Another important shift affecting the Corps has been federal cost-sharing arrangements (enacted in 1986), mandating greater financial participation in Corps water projects by local co-sponsors. The book describes how this has affected the Corps-sponsor relationship, and comments upon how each group must adjust to new planning and political realities.
Author: United States Government Accountability Office
Publisher: Createspace Independent Publishing Platform
Published: 2018-01-08
Total Pages: 58
ISBN-13: 9781983615665
DOWNLOAD EBOOKArmy Corps of Engineers: Peer Review Process for Civil Works Project Studies Can Be Improved
Author: Linda Harmon
Publisher: DIANE Publishing
Published: 2002-02
Total Pages: 78
ISBN-13: 9780756731670
DOWNLOAD EBOOKThere are concerns about the possible negative impacts that the U.S. Army Corps of Engineers' (CE) construction of water resources projects may have on fish and wildlife and their habitat. This report: (1) determined the number of CE civil works projects for which the Corps completed less than 50% of mitigation before starting construction, and (2) established a panel of scientific experts to examine this. This report assesses the quality of each program's guidance: (1) for the 5 stages of mitigation; (2) for 5 attributes -- currency, clarity, completeness, breadth, and viability of the natural and man-made systems into the future; and (3) overall, taking into consideration the stages and attributes. Charts and tables.