Santa Ana River Main Stem Including Santiago Creek and Oak Street Drain. Phase I GDM (General Design Memorandum). Appendix G. Recreation

Santa Ana River Main Stem Including Santiago Creek and Oak Street Drain. Phase I GDM (General Design Memorandum). Appendix G. Recreation

Author: ARMY ENGINEER DISTRICT LOS ANGELES CA.

Publisher:

Published: 1980

Total Pages: 140

ISBN-13:

DOWNLOAD EBOOK

This appendix is a preliminary study of recreation potentials that would be created by the proposed flood control projects. Included are demographic characteristics by the separate project areas; topographical, geological, and ecological features; market area analysis, both present and projected; inventory and analysis of existing costs, benefits and cost sharing projections; and identification of planning objectives for recreation and esthetic treatment and proposals for their accomplishment. (Author).