GAO Documents

GAO Documents

Author: United States. General Accounting Office

Publisher:

Published: 1981

Total Pages: 924

ISBN-13:

DOWNLOAD EBOOK

Catalog of reports, decisions and opinions, testimonies and speeches.


Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans

Author: Ronald O'Rourke

Publisher:

Published: 2020-11-14

Total Pages: 145

ISBN-13:

DOWNLOAD EBOOK

Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.


Assessment of Surface Ship Maintenance Requirements

Assessment of Surface Ship Maintenance Requirements

Author: Robert Button

Publisher: Rand Corporation

Published: 2015

Total Pages: 0

ISBN-13:

DOWNLOAD EBOOK

The Department of Defense is likely to face years of declining resources as the U.S. government grapples with fiscal challenges. These challenges affect every account, including those associated with surface ship maintenance and operations. At the same time, there has been widespread concern that surface ship materiel readiness is declining due to a high pace of operations and a sense that there have been many instances of deferred maintenance. The need to balance fiscal reality and a continued need for ready ships is likely to be an ongoing challenge. At the request of the Assessment Division of the Office of the Chief of Naval Operations, this report: (1) determines the impact on long-term fleet readiness, Operational Availability (Ao), and Expected Service Life (ESL) caused by near-term reductions in Operations and Maintenance (O&M) accounts; (2) recommends potential strategies to minimize negative impacts to Ao and ESL and maintain the largest, most capable fleet possible; (3) develops a maintenance requirement concept, per ship class, that supports ESL, but allows for some risk within the maintenance strategy; and (4) defines the risks to Ao and ESL resulting from the new requirement. The methodology could be applicable to multiple ship classes.