Schultz-Hanford Area Transmission Line Project
Author:
Publisher:
Published: 2003
Total Pages: 378
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author:
Publisher:
Published: 2003
Total Pages: 378
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2002
Total Pages: 184
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1991
Total Pages: 212
ISBN-13:
DOWNLOAD EBOOKThis report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB).
Author:
Publisher:
Published: 1980
Total Pages: 126
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1995
Total Pages: 170
ISBN-13:
DOWNLOAD EBOOKThe Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).
Author:
Publisher:
Published: 1977
Total Pages: 546
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1996
Total Pages: 558
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1992
Total Pages: 490
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2010
Total Pages: 840
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1979
Total Pages: 90
ISBN-13:
DOWNLOAD EBOOK