Fabricate and Install Yakima Basin Phase II Fish Screens; Washington Department of Fish and Wildlife, 2006 Final Report

Fabricate and Install Yakima Basin Phase II Fish Screens; Washington Department of Fish and Wildlife, 2006 Final Report

Author: Washington Department of Fish and Wildlife

Publisher:

Published: 2006

Total Pages: 6

ISBN-13:

DOWNLOAD EBOOK

The goal of this project was to restore ESA listed and resident fish stocks within the Yakima Basin by preventing mortality and/or injury to all life stages of anadromous and resident fish at irrigation diversions. This goal is being accomplished through an on-going effort by the Yakima Basin Phase II Technical Work Group (TWG), which is comprised of local, state, federal, tribal and private groups who prioritize and assign screening projects.


Fabricate and Install Yakima Basin Phase II Fish Screens; Washington Department of Fish and Wildlife, 2002-2003 Annual Report

Fabricate and Install Yakima Basin Phase II Fish Screens; Washington Department of Fish and Wildlife, 2002-2003 Annual Report

Author: Patrick C. Schille

Publisher:

Published: 2004

Total Pages: 5

ISBN-13:

DOWNLOAD EBOOK

The goal of this project is to prevent mortality and/or injury to all life stages of anadromous and resident fish at irrigation diversions. Obsolete Yakima basin fish screens constructed in the 1930's, 40's, 50's, 60's, and 70's must be replaced or updated to comply with current regional fish screen biological protection criteria adopted by Columbia Basin Fish and Wildlife Authority (CBFWA), Fish Screening Oversight Committee (FSOC) in 1995. This goal is being accomplished through an on-going effort by the Yakima Basin Phase II Technical Work Group (TWG), which is comprised of local, state, federal, tribal and private groups who prioritizes and assign screening projects. Prioritized screening projects are completed through coordination between the Bureau of Reclamations (BOR), who design and permit, and the WDFW who fabricate the screens for these projects. The following is the 2004 fish screening facility construction schedule as proposed by the Bureau of Reclamation Design Group (USBR) and Fish Passage Technical Work Group (TWG).


Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2005-2006 Annual Report

Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2005-2006 Annual Report

Author: Patrick C. Schille

Publisher:

Published: 2006

Total Pages: 7

ISBN-13:

DOWNLOAD EBOOK

The goal of this project is to assure that the benefits of BPA's capital investment in Yakima Basin Phase II fish screen facilities are realized by performing operations that assure optimal fish protection and long facility life through a rigorous preventative maintenance program, while helping to restore ESA listed fish stocks in the Yakima River Basin.


Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2003-2004 Annual Report

Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2003-2004 Annual Report

Author: Patrick C. Schille

Publisher:

Published: 2004

Total Pages: 7

ISBN-13:

DOWNLOAD EBOOK

The goal of this project is to assure that the benefits of BPA's capital investment in Yakima Basin Phase II fish screen facilities are realized by performing operations that assure optimal fish protection and long facility life through a rigorous preventative maintenance program, while helping to restore ESA listed fish stocks in the Yakima River Basin.


Washington Phase II Fish Diversion Screen Evaluations in the Yakima and Touchet River Basins, 2005-2006 Annual Reports

Washington Phase II Fish Diversion Screen Evaluations in the Yakima and Touchet River Basins, 2005-2006 Annual Reports

Author:

Publisher:

Published: 2006

Total Pages: 81

ISBN-13:

DOWNLOAD EBOOK

In 2005, Pacific Northwest National Laboratory (PNNL) researchers evaluated 25 Phase II fish screen sites in the Yakima and Touchet river basins. Pacific Northwest National Laboratory performs these evaluations for Bonneville Power Administration (BPA) to determine whether the fish screening devices meet National Marine Fisheries Service (NMFS) criteria to promote safe and timely fish passage. Evaluations consist of measuring velocities in front of the screens, using an underwater camera to look at the condition and environment in front of the screens, and noting the general condition and operation of the sites. Results of the evaluations in 2005 include the following: (1) Most approach velocities met the NMFS criterion of less than or equal to 0.4 fps. Less than 13% of all approach measurements exceeded the criterion, and these occurred at 10 of the sites. Flat-plate screens had more problems than drum screens with high approach velocities. (2) Bypass velocities generally were greater than sweep velocities, but sweep velocities often did not increase toward the bypass. The latter condition could slow migration of fish through the facility. (3) Screen and seal materials generally were in good condition. (4) Automated cleaning brushes generally functioned properly; chains and other moving parts were typically well-greased and operative. (5) Washington Department of Fish and Wildlife (WDFW) and U.S. Bureau of Reclamation (USBR) generally operate and maintain fish screen facilities in a way that provides safe passage for juvenile fish. (6) In some instances, irrigators responsible for specific maintenance at their sites (e.g., debris removal) are not performing their tasks in a way that provides optimum operation of the fish screen facility. New ways need to be found to encourage them to maintain their facilities properly. (7) We recommend placing datasheets providing up-to-date operating criteria and design flows in each sites logbox. The datasheet should include bypass design flows and a table showing depths of water over the weir and corresponding bypass flow. This information is available at some of the sites but may be outdated. These data are used to determine if the site is running within design criteria. (8) Modifying use of debris control plates at Gleed helped minimize the extreme fluctuations in flow, but approach velocities are still too high. Other ways to reduce the approach velocities need to be tried, possibly including redesign of the site. (9) Alternatives to a screen site at Taylor should be considered. A lot of effort was spent trying to increase water to the site, but it still was unable to operate within NMFS criteria for most of the year and may be a hazard to juvenile salmonids. We conclude that the conditions at most of the Phase II fish screen facilities we evaluated in 2005 would be expected to provide safe passage for juvenile fish. For those sites where conditions are not always optimum for safe fish passage, PNNL researchers will try to coordinate with the WDFW and USBR in 2006 to find solutions to the problems. Some of those problems are consistently high approach velocities at specific sites, including Congdon, Naches-Selah, Union Gap, and Yakima-Tieton. We would like to be able to monitor changes in velocities as soon as operations and maintenance personnel adjust the louvers or porosity boards at these sites. This will give them immediate feedback on the results of their modifications and allow additional adjustments as necessary until the conditions meet NMFS criteria. Pacific Northwest National Laboratory has performed evaluations at many of these sites over the past 8 years, providing information WDFW and USBR personnel can use to perform their operations and maintenance more effectively. Consequently, overall effectiveness of the screens facilities has improved over time.


Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2001-2002 Annual Report

Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2001-2002 Annual Report

Author: Patrick C. Schille

Publisher:

Published: 2003

Total Pages: 6

ISBN-13:

DOWNLOAD EBOOK

The goal of this project is to assure that the benefits of BPA's capital investment in Yakima Basin Phase II fish screen facilities are realized by performing operations that assure optimal fish protection and long facility life through a rigorous preventative maintenance program, while helping to restore ESA listed fish stocks in the Yakima River Basin.


Yakima and Touchet River Basins Phase II Fish Screen Evaluation, 2006-2007 Annual Report

Yakima and Touchet River Basins Phase II Fish Screen Evaluation, 2006-2007 Annual Report

Author:

Publisher:

Published: 2007

Total Pages: 97

ISBN-13:

DOWNLOAD EBOOK

In 2006, Pacific Northwest National Laboratory (PNNL) researchers evaluated 27 Phase II fish screen sites in the Yakima and Touchet river basins. Pacific Northwest National Laboratory performs these evaluations for Bonneville Power Administration (BPA) to determine whether the fish screening devices meet those National Marine Fisheries (NMFS) criteria for juvenile fish screen design, that promote safe and timely passage of juvenile salmonids. The NMFS criteria against which the sites were evaluated are as follows: (1) a uniform flow distribution over the screen surface to minimize approach velocity; (2) approach velocities less than or equal to 0.4 ft/s protects the smallest salmonids from impingement; (3) sweep velocities that are greater than approach velocities to minimize delay of out-migrating juveniles and minimize sediment deposition near the screens; (4) a bypass flow greater than or equal to the maximum flow velocity vector resultant upstream of the screens to also minimize delay of out-migrating salmonids; (5) a gradual and efficient acceleration of flow from the upstream end of the site into the bypass entrance to minimize delay of out-migrating salmonids; and (6) screen submergence between 65% and 85% for drum screen sites. In addition, the silt and debris accumulation next to the screens should be kept to a minimum to prevent excessive wear on screens, seals and cleaning mechanisms. Evaluations consist of measuring velocities in front of the screens, using an underwater camera to assess the condition and environment in front of the screens, and noting the general condition and operation of the sites. Results of the evaluations in 2006 include the following: (1) Most approach velocities met the NMFS criterion of less than or equal to 0.4 ft/s. Of the sites evaluated, 31% exceeded the criterion at least once. Thirty-three percent of flat-plate screens had problems compared to 25% of drum screens. (2) Woody debris and gravel deposited during high river levels were a problem at several sites. In some cases, it was difficult to determine the bypass pipe was plugged until several weeks had passed. Slow bypass flow caused by both the obstructions and high river levels may have discouraged fish from entering the bypass, but once they were in the bypass, they may have had no safe exit. Perhaps some tool or technique can be devised that would help identify whether slow bypass flow is caused by pipe blockage or by high river levels. (3) Bypass velocities generally were greater than sweep velocities, but sweep velocities often did not increase toward the bypass. The latter condition could slow migration of fish through the facility. (4) Screen and seal materials generally were in good condition. (5) Automated cleaning brushes generally functioned properly; chains and other moving parts were typically well-greased and operative. (6) Washington Department of Fish and Wildlife (WDFW) and U.S. Bureau of Reclamation (USBR) generally operated and maintained fish screen facilities in a way that provided safe passage for juvenile fish. (7) Efforts with WDFW to find optimal louver settings at Naches-Selah were partly successful. The number of spots with excessive approach velocities was decreased, but we were unable to adjust the site to bring all approach values below 0.4 ft/s. (8) In some instances, irrigators responsible for specific maintenance at their sites (e.g., debris removal) did not perform their tasks in a way that provided optimum operation of the fish screen facility. Enforcement personnel proved effective at reminding irrigation districts of their responsibilities to maintain the sites for fish protection as well as irrigation. (9) We recommend placing datasheets providing up-to-date operating criteria and design flows in each site's logbox. The datasheet should include bypass design flows and a table showing depths of water over the weir and corresponding bypass flow. A similar datasheet relating canal gage readings and canal discharge in cubic feet per second would help identify times when the canal is taking more water than it should. This information is available at some of the sites and assists operators in determining if the site is running within the site specific design criteria. (10) Data were collected at Gleed when the protective metal plates were set down to the forebay floor and when they were raised to expose most of the screens. These data were sent to USBR personnel for use in looking for ways to reduce high approach velocities and erratic flow pattern at Gleed. (11) Alternatives to a screen site at Taylor are apparently being considered. A lot of effort was spent in 2005 and 2006 trying to increase water to the site, but it still was unable to operate within NMFS criteria for much of the year and may be a hazard to juvenile salmonids at times.


Yakima River Basin Fish Passage Phase II Fish Screen Construction, Project Completion Report

Yakima River Basin Fish Passage Phase II Fish Screen Construction, Project Completion Report

Author:

Publisher:

Published: 2008

Total Pages: 14

ISBN-13:

DOWNLOAD EBOOK

On December 5, 1980, Congress passed the Pacific Northwest Electric Power Planning and Conservation Act (Public Law 96-501). The Act created the Northwest Power Planning Council (now the Northwest Power and Conservation Council). The Council was charged with the responsibility to prepare a Regional Conservation and Electric Power Plan and to develop a program to protect, mitigate, and enhance fish and wildlife including related spawning grounds and habitat on the Columbia River and its tributaries. The Council adopted its Fish and Wildlife Program on November 15, 1982. Section 800 of the Program addresses measures in the Yakima River Basin. The Yakima measures were intended to help mitigate hydroelectric impacts in the basin and provide off-site mitigation to compensate for fish losses caused by hydroelectric project development and operations throughout the Columbia River Basin. The Bonneville Power Administration (BPA) was designated as a major source of funding for such off-site mitigation measures and was requested to initiate discussions with the appropriate Federal project operators and the Council to determine the most expeditious means for funding and implementing the program. The primary measures proposed for rapid implementation in the Yakima River basin were the installation of fish passage and protective facilities. Sec. 109 of The Hoover Power Plant Act of 1984, authorized the Secretary of the Interior to design, construct, operate, and maintain fish passage facilities within the Yakima River Basin. Under Phase I of the program, improvements to existing fish passage facilities and installation of new fish ladders and fish screens at 16 of the largest existing diversion dams and canals were begun in 1984 and were completed in 1990. The Yakima Phase II fish passage program is an extension of the Phase I program. In 1988, the Yakama Nation (YN) submitted an application to amend Sections 803(b) and 1403(4.5) of the Northwest Power and Conservation Council's Columbia River Basin Fish and Wildlife Program to begin preliminary design on the Phase II fish screen program. Based on citizen and agency endorsement, the Council approved the amendment in 1989. The Council authorized BPA to provide funding for Phase II screens through the Fish and Wildlife Program. BPA then asked the Bureau of Reclamation to provide engineering and design expertise to the Phase II projects.