Evaluation of Contract Time Estimation and Contracting Procedures for Louisiana Department of Transportation and Development Construction Projects
Author:
Publisher:
Published: 1995
Total Pages: 140
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author:
Publisher:
Published: 1995
Total Pages: 140
ISBN-13:
DOWNLOAD EBOOKAuthor: Jin-Fang Shr
Publisher:
Published: 1999
Total Pages: 204
ISBN-13:
DOWNLOAD EBOOKCurrently, most SHAs and contractors use traditional methods. However, more exact time estimates and closer cost predictions are necessary to enable the use of these innovative methods. This research will explore the following topics. For the Florida Department of Transportation (FDOT) (1) how to determine a reasonable range of B in an A + B contract, and (2) how to determine a maximum incentive and maximum days of incentive in an I/D contract. For contractors interested in FDOT projects, (1) what is the best strategy to determine a bid price in an I/D contract, and (2) what is the best strategy to determine a bid price using an A + B + I/D contract. Data from the Florida Department of Transportation (FDOT) are used to verify models to respond to the topics above.
Author: United States. Congress. House Appropriations
Publisher:
Published: 1971
Total Pages: 1206
ISBN-13:
DOWNLOAD EBOOKAuthor: Zohar J. Herbsman
Publisher:
Published: 1995
Total Pages: 56
ISBN-13:
DOWNLOAD EBOOKThis synthesis will be of interest to highway administrators; design, construction, and specification engineers; project schedulers; and highway construction contractors. The synthesis describes the state of the practice with respect to procedures used throughout the United States and other countries to determine highway construction contract time, with emphasis on new methods in use. Transportation agencies must set reasonable times for completion of construction projects. Factors to be considered in determining contract time include materials, equipment, labor, cost, and constraints such as weather, traffic conditions, utilities location, and user convenience. This report of the Transportation Research Board covers the still pertinent procedures from NCHRP Synthesis 79: Contract Time Determination (e. g., critical path methods, linear scheduling, bar charts) as well as new methods in use (e.g., A + B methods, lane rental, flexible time-to- start). In addition to information on various methods to determine contract time, information on issues related to implementing procedures for contract time determination, from both agency and contractor perspective, is included.
Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Department of Transportation and Related Agencies Appropriations
Publisher:
Published: 1971
Total Pages: 1776
ISBN-13:
DOWNLOAD EBOOKAuthor: David F. Rogge
Publisher:
Published: 2002
Total Pages: 108
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2009
Total Pages: 164
ISBN-13:
DOWNLOAD EBOOKAuthor: David F. Rogge
Publisher:
Published: 2003
Total Pages: 168
ISBN-13:
DOWNLOAD EBOOK