Archaeological Monitoring for the Espada Road Widening and Infrastructure Upgrades Project, San Antonio, Bexar County, Texas
Author: Leonard Kemp
Publisher:
Published: 2018
Total Pages: 23
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author: Leonard Kemp
Publisher:
Published: 2018
Total Pages: 23
ISBN-13:
DOWNLOAD EBOOKAuthor: I. Waynne Cox
Publisher:
Published: 1993
Total Pages: 4
ISBN-13:
DOWNLOAD EBOOKAuthor: Michael Nevin Smith
Publisher:
Published: 2016
Total Pages: 74
ISBN-13:
DOWNLOAD EBOOKAuthor: I. Waynne Cox
Publisher:
Published: 1992
Total Pages: 41
ISBN-13:
DOWNLOAD EBOOKAuthor: Jon Dowling
Publisher:
Published: 2006
Total Pages: 10
ISBN-13:
DOWNLOAD EBOOKAuthor: Antonia L. Figueroa
Publisher:
Published: 2021
Total Pages: 38
ISBN-13:
DOWNLOAD EBOOKAuthor: Nesta J. Anderson
Publisher:
Published: 2021
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor: Antonia L. Figueroa
Publisher:
Published: 2011
Total Pages: 23
ISBN-13:
DOWNLOAD EBOOKAuthor: Cynthia M. Dickey
Publisher:
Published: 2014
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor: Bruce K. Moses
Publisher:
Published: 2014
Total Pages: 13
ISBN-13:
DOWNLOAD EBOOKThe Center for Archaeological Research (CAR) at the University of Texas at San Antonio (UTSA) was contracted by the Witte Museum to conduct archaeological monitoring on their grounds in association with a proposed 4700 square foot addition to the Pioneer Hall. Following the proposed improvements, Pioneer Hall will be renamed the South Texas Heritage Center. This project entailed the monitoring of four mechanically excavated trenches as well as ten drilled pier shafts. The project area is within the environs of the Acequia Madre (41BX8) and several prehistoric sites have been identified nearby. During the course of the project, no Spanish Colonial or prehistoric deposits were encountered, and no remnants of the Acequia Madre (41BX8) were noted. Trenches were photo-documented and mapped prior to being backfilled. No cultural artifacts were collected during the project. All project related documents are curated at the CAR facility. CAR recommends that the proposed construction associated with Phase 1 of the Witte Museum Expansion Project proceed as planned.