Appendix II, Coast of California, Point Mugu to San Pedro Breakwater, Beach Erosion Control Study. Letter from the Secretary of the Army Transmitting a Letter from the Chief of Engineers, United States Army, Dated June 5, 1952, Submitting a Report ... on a Cooperative Beach Erosion Control Study ... November 3, 1953. -- Referred to the Committee on Public Works and Ordered to be Printed with Illustrations, Pursuant to Public Law 153, 83d Congress

Appendix II, Coast of California, Point Mugu to San Pedro Breakwater, Beach Erosion Control Study. Letter from the Secretary of the Army Transmitting a Letter from the Chief of Engineers, United States Army, Dated June 5, 1952, Submitting a Report ... on a Cooperative Beach Erosion Control Study ... November 3, 1953. -- Referred to the Committee on Public Works and Ordered to be Printed with Illustrations, Pursuant to Public Law 153, 83d Congress

Author:

Publisher:

Published: 1954

Total Pages:

ISBN-13:

DOWNLOAD EBOOK


Appendix II, Coast of California, Point Mugu to San Pedro Breakwater, Beach Erosion Control Study. Letter from the Secretary of the Army Transmitting a Letter from the Chief of Engineers, United States Army, Dated June 5, 1952, Submitting a Report, Together with Accompanying Papers and Illustrations, on a Cooperative Beach Erosion Control Study of the Pacific Coast Line of the State of California, Ventura and Los Angeles Counties, from Point Mugu to San Pedro Breakwater, Appendix II, Prepared Under the Provisions of Section 2 of the River and Harbor Act Approved on July 3, 1930, as Amended and Supplemented

Appendix II, Coast of California, Point Mugu to San Pedro Breakwater, Beach Erosion Control Study. Letter from the Secretary of the Army Transmitting a Letter from the Chief of Engineers, United States Army, Dated June 5, 1952, Submitting a Report, Together with Accompanying Papers and Illustrations, on a Cooperative Beach Erosion Control Study of the Pacific Coast Line of the State of California, Ventura and Los Angeles Counties, from Point Mugu to San Pedro Breakwater, Appendix II, Prepared Under the Provisions of Section 2 of the River and Harbor Act Approved on July 3, 1930, as Amended and Supplemented

Author: United States. Congress. House. Committee on Public Works

Publisher:

Published: 1953

Total Pages: 212

ISBN-13:

DOWNLOAD EBOOK


Letter from the Secretary of the Army Transmitting a Letter from the Chief of Engineers, Department of the Army, Dated June 6, 1952, Submitting a Report, Together with Accompanying Papers and Illustrations, on a Cooperative Beach Erosion Control Study of the Pacific Coast Line of the State of California, Santa Barbara and Ventura Counties from Carpinteria to Point Mugu, Appendix I, Prepared Under the Provisions of Section 2 of the River and Harbor Act Approved July 3, 1930, as Amended and Supplemented, Pursuant to Public Law 504, 82d Congress

Letter from the Secretary of the Army Transmitting a Letter from the Chief of Engineers, Department of the Army, Dated June 6, 1952, Submitting a Report, Together with Accompanying Papers and Illustrations, on a Cooperative Beach Erosion Control Study of the Pacific Coast Line of the State of California, Santa Barbara and Ventura Counties from Carpinteria to Point Mugu, Appendix I, Prepared Under the Provisions of Section 2 of the River and Harbor Act Approved July 3, 1930, as Amended and Supplemented, Pursuant to Public Law 504, 82d Congress

Author: United States. Army. Corps of Engineers

Publisher:

Published: 1953

Total Pages: 492

ISBN-13:

DOWNLOAD EBOOK


Appendix I, Coast of California, Carpinteria to Point Mugu, Beach Erosion Control Study. Letter from the Secretary of the Army Transmitting a Letter from the Chief of Engineers, United States Army, Dated June 6, 1952, Submitting a Report, Together with Accompanying Papers and Illustrations, on a Cooperative Beach Erosion Control Study of the Pacific Coast Line of the State of California, Santa Barbara and Ventura Counties from Carpinteria to Point Mugu, Appendix I, Prepared Under the Provisions of Section 2 of the River and Harbor Act Approved on July 3, 1930, as Amended and Supplemented

Appendix I, Coast of California, Carpinteria to Point Mugu, Beach Erosion Control Study. Letter from the Secretary of the Army Transmitting a Letter from the Chief of Engineers, United States Army, Dated June 6, 1952, Submitting a Report, Together with Accompanying Papers and Illustrations, on a Cooperative Beach Erosion Control Study of the Pacific Coast Line of the State of California, Santa Barbara and Ventura Counties from Carpinteria to Point Mugu, Appendix I, Prepared Under the Provisions of Section 2 of the River and Harbor Act Approved on July 3, 1930, as Amended and Supplemented

Author: United States. Congress. House. Committee on Public Works

Publisher:

Published: 1953

Total Pages: 170

ISBN-13:

DOWNLOAD EBOOK