A Manual for Applying the Critical Path Method to Highway Department Engineering and Administration
Author: Preston (E.S.) & Associates, ltd
Publisher:
Published: 1963
Total Pages: 242
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author: Preston (E.S.) & Associates, ltd
Publisher:
Published: 1963
Total Pages: 242
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1963
Total Pages: 466
ISBN-13:
DOWNLOAD EBOOKAuthor: D. M. Reid
Publisher:
Published: 1974
Total Pages: 200
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher: UM Libraries
Published: 1965
Total Pages: 144
ISBN-13:
DOWNLOAD EBOOKAuthor: Massachusetts Institute of Technology. Department of Civil Engineering
Publisher:
Published: 1965
Total Pages: 194
ISBN-13:
DOWNLOAD EBOOKAuthor: T. J. Ramaiah
Publisher: Abhinav Publications
Published: 1979
Total Pages: 216
ISBN-13: 9788170170990
DOWNLOAD EBOOKThis Book Deals With Programme Evaluation And Review Technique (Pert), An Integrated Methodology For Planning, Scheduling And Controlling Of Programmes And Projects, With Special Reference To A Service Sector Like Health And Familiy Welfare. The Time And Functional Relationship Between Different Tasks Of A Programme Or Project Are Explored Through The Development Of Pert Networks. It Treats Extensively The Estimation Of Different Types Of Resources Required, Their Costing And The Optimization Of Programme Costs And Programme Duration To Achieve Specified Objectives. The Development Of Information Systems For Monitoring And Control Of Programmes And Projects Based On Pert Is Discussed. The Methodologies Are Extensively Illustrated To Provide Insights Into Their Application. This Book Fills A Void In The Availability Of Such Literature On Modern Management Methods, Oriented Towards The Health And Family Welfare Sector. Its Emphasis Is On Providing Both Knowledge And Skills In The Use Of Pert Methodology For More Effective Management Of Programmes And Projects.
Author: Robley Winfrey
Publisher:
Published: 1969
Total Pages: 942
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1967-05
Total Pages: 1470
ISBN-13:
DOWNLOAD EBOOKAuthor: United States. Bureau of Public Roads
Publisher:
Published: 1961
Total Pages: 244
ISBN-13:
DOWNLOAD EBOOKAuthor: John Alan Havers
Publisher: McGraw-Hill Companies
Published: 1971
Total Pages: 1428
ISBN-13:
DOWNLOAD EBOOK