The Fort Loudoun Project

The Fort Loudoun Project

Author: Tennessee Valley Authority

Publisher:

Published: 1949

Total Pages: 556

ISBN-13:

DOWNLOAD EBOOK

Fort Loudon Dam was the last of seven main-river dams proposed for construction in TVA's report to Congress dated March 31, 1936, and is the upper link in the chain of dams for navigation envisioned in the TVA Act. A record of the more important facts concerning planning, design, construction, cost, and initial operations of this major unit in the integrated water-control system is contained herein as Technical Report No. 11. It has been prepared from detailed reports in the files of TVA and has been edited to present special coverage to new or unprecedented procedures with relatively less emphasis on standard practices of engineering and construction.


Design of TVA Projects: Electrical design of hydro plants

Design of TVA Projects: Electrical design of hydro plants

Author: Tennessee Valley Authority

Publisher:

Published: 1953

Total Pages: 476

ISBN-13:

DOWNLOAD EBOOK

This is the second of three volumes comprising the Design of TVA Projects and is one of a planned series of special reports recording the experience of TVA in carrying out the major phases of its engineering and construction program. It undertakes to explain the engineering work involved in the design of electrical installations for primary water control stations of TVA, including switch-yards constructed at the generating stations but not transmission lines and substations.