Technical Evaluation of the Adequacy of Station Electric Distribution System Voltages for the Rancho Seco Nuclear Generating Station, Unit No. 1

Technical Evaluation of the Adequacy of Station Electric Distribution System Voltages for the Rancho Seco Nuclear Generating Station, Unit No. 1

Author:

Publisher:

Published: 1981

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

This report documents the technical evaluation of the adequacy of the station electric distribution system voltages for the Rancho Seco Nuclear Generation Station, Unit No. 1. The evaluation is to determine if the onsite distribution system, in conjunction with the offsite power sources, has sufficient capacity to automatically start and operate all Class 1E loads within the equipment voltage ratings under certain conditions established by the Nuclear Regulatory Commission. The licensee demonstrates with the analysis that with certain modifications the guidelines and requirements of the NRC will be met.


Technical Evaluation of the Adequacy of Station Electric Distribution System Voltages for the R.E. Ginna Nuclear Power Station, Unit 1

Technical Evaluation of the Adequacy of Station Electric Distribution System Voltages for the R.E. Ginna Nuclear Power Station, Unit 1

Author:

Publisher:

Published: 1981

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

This report documents the technical evaluation of the adequacy of the station electric distribution system voltages for the R.E. Ginna Nuclear Power Station, Unit 1. The evaluation is to determine if the onsite distribution system, in conjunction with the offsite power sources, has sufficient capacity to automatically start and operate all Class 1E loads within the equipment voltage ratings under certain conditions established by the Nuclear Regulatory Commission. The analysis submitted demonstrates that acceptable voltages will be supplied to the Class 1E equipment under worst case conditions.


Technical-evaluation Report on the Adequacy of Station Electric-distribution-system Voltages for the Prairie Island Nuclear Generating Plant, Units 1 and 2. (Docket Nos. 50-282, 50-306).

Technical-evaluation Report on the Adequacy of Station Electric-distribution-system Voltages for the Prairie Island Nuclear Generating Plant, Units 1 and 2. (Docket Nos. 50-282, 50-306).

Author:

Publisher:

Published: 1982

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

This report documents the technical evaluation of the adequacy of the station electric distribution system voltages for the Prairie Island Nuclear Generating Plant, Units 1 and 2. The evaluation is to determine if the onsite distribution system in conjunction with the offsite power sources has sufficient capacity to automatically start and operate all Class 1E loads within the equipment voltage ratings under certain conditions established by the Nuclear Regulatory Commission. The evaluation finds that with some minor transformer loading modifications, hardware changes and the results of equipment testing and manufacturer data, the offsite sources were demonstrated to supply adequate voltage to the Class 1E equipment under worst case conditions.


Energy Research Abstracts

Energy Research Abstracts

Author:

Publisher:

Published: 1983

Total Pages: 738

ISBN-13:

DOWNLOAD EBOOK

Includes all works deriving from DOE, other related government-sponsored information and foreign nonnuclear information.


Government Reports Annual Index

Government Reports Annual Index

Author:

Publisher:

Published: 1982

Total Pages: 974

ISBN-13:

DOWNLOAD EBOOK

Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.