This report, provided annually in accordance with DOE Order 5400.1, summarizes monitoring data collected to assess Strategic Petroleum Reserve (SPR) impacts on the environment. The report serves as a management tool for mitigating such impacts, thus serving the public interest by ensuring environmentally sound operation of the SPR. Included in this report is a description of each site's environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1992. The active permits and the results of the environmental monitoring program (i.e., air, surface water, ground water, and water discharges) are discussed within each section by site. The quality assurance program is presented which includes results from laboratory and field audits and studies performed internally and by regulatory agencies. In general, no significant adverse environmental impact resulted from any SPR activities during 1992. Environmental areas of concern, such as potential ground water contamination, are fully addressed in the applicable section by site. The SPR continues to maintain an overall excellent environmental record.


Strategic Petroleum Reserve Site Environmental Report for Calendar Year 1994

Strategic Petroleum Reserve Site Environmental Report for Calendar Year 1994

Author:

Publisher:

Published: 1995

Total Pages: 174

ISBN-13:

DOWNLOAD EBOOK

The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. The SER, provided annually in accordance with Department of Energy DOE Order 5400.1, serves the public by summarizing monitoring data collected to assess how the Strategic Petroleum Reserve (SPR) impacts the environment. This report (SER) provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a description of each site's environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1994. Two of these highlights include decommissioning of the Weeks Island facility (disposition of 73 million barrels of crude oil inventory) as well as the degasification of up to 144 million barrels of crude oil inventory at the Bayou Choctaw, Big Hill, Bryan Mound, and West Hackberry facilities. The decision to decommission the Weeks Island facility is a result of diminishing mine integrity from ground water intrusion. Degasifying the crude oil is required to reduce potentially harmful emissions that would occur during oil movements. With regard to still another major environmental action, 43 of the original 84 environmental findings from the 1992 DOE Tiger Team Assessment were closed by the end of 1994. Spills to the environment, another major topic, indicates a positive trend. Total volume of oil spilled in 1994 was only 39 barrels, down from 232 barrels in 1993, and the total volume of brine spilled was only 90 barrels, down from 370 barrels in 1993. The longer term trend for oil and brine spills has declined substantially from 27 in 1990 down to nine in 1994.


Strategic Petroleum Reserve Site Environmental Report for Calendar Year 1997

Strategic Petroleum Reserve Site Environmental Report for Calendar Year 1997

Author:

Publisher:

Published: 1998

Total Pages: 200

ISBN-13:

DOWNLOAD EBOOK

The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts for the US Department of Energy (DOE) Strategic Petroleum Reserve (SPR). The SER, provided annually in accordance with DOE order 5400.1, serves the public by summarizing monitoring data collected to assess how the SPR impacts the environment. The SER provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a describe of each site's environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1997. Two of these highlights include decommissioning of the Weeks Island site, involving the disposition of 11.6 million m3 (73 million barrels) of crude oil inventory, as well as the degasification of over 12.6 million m3 (79.3 million barrels) of crude oil inventory at the Big Hill and Bryan Mound facilities.


Strategic Petroleum Reserve Annual

Strategic Petroleum Reserve Annual

Author:

Publisher:

Published: 1993

Total Pages: 50

ISBN-13:

DOWNLOAD EBOOK

During 1992 the Department continued planning activities for the expansion of the Strategic Petroleum Reserve to one billion barrels. A draft Environmental Impact Statement for the five candidate sites was completed in October 1992, and a series of public hearings was held during December 1992. Conceptual design engineering activities, life cycle cost estimates and geotechnical studies to support the technical requirements for an Strategic Petroleum Reserve Plan Amendment were essentially completed in December 1992. At the end of 1992, the Strategic Petroleum Reserve crude oil inventory was 574.7 million barrels and an additional 1.7 million barrels was in transit to the Reserve. During 1992 approximately 6.2 million barrels of crude oil were acquired for the Reserve. A Department of Energy Tiger Team Environmental, Safety and Health (ES & H) Assessment was conducted at the Strategic Petroleum Reserve from March 9 through April 10, 1992. In general, the Tiger Team found that Strategic Petroleum Reserve activities do not pose undue environmental, safety or health risks. The Strategic Petroleum Reserve's Final Corrective Action Plan, prepared in response to the Tiger Team assessment, was submitted for Department approval in December 1992. On November 18, 1992, the Assistant Secretary for Fossil Energy selected DynMcDennott Petroleum Operations Company to provide management and operating services for the Strategic Petroleum Reserve for a period of 5 years commencing April 1, 1993. DynMcDermott will succeed Boeing Petroleum Services, Inc.