Statement of Work for Conceptual Design of Solidified High-level Waste Interim Storage System Project (phase I).
Author:
Publisher:
Published: 1996
Total Pages: 53
ISBN-13:
DOWNLOAD EBOOKThe U.S. Department of Energy (DOE) has embarked upon a course to acquire Hanford Site tank waste treatment and immobilization services using privatized facilities. This plan contains a two phased approach. Phase I is a ''proof-of-principle/commercial demonstration- scale'' effort and Phase II is a full-scale production effort. In accordance with the planned approach, interim storage (IS) and disposal of various products from privatized facilities are to be DOE furnished. The path forward adopted for Phase I solidification HLW IS entails use of Vaults 2 and 3 in the Spent Nuclear Fuel Canister Storage Building, to be located in the Hanford Site 200 East Area. This Statement of Work describes the work scope to be performed by the Architect-Engineer to prepare a conceptual design for the solidified HLW IS System.