State Route 5, Airdustrial Interchange to Trosper Road Interchange

State Route 5, Airdustrial Interchange to Trosper Road Interchange

Author:

Publisher:

Published: 1979

Total Pages: 0

ISBN-13:

DOWNLOAD EBOOK

"The purpose of this report is to examine the feasibility of constructing a new full diamond interchange just south of the City of Tumwater at or near M.P. 101.2 on SR 5 and the construction of 5th and 6th lanes on SR 5 from the new interchange location north to the Trosper Road Interchange (M.P. 102.7 Vicinity). The new interchange would provide access to and from the Port of Olympia Airdustrial park area as well as providing a new connection between local arterial roads east and west of the freeway." --Introduction


SR 5, Airdustrial Interchange to Trosper Road

SR 5, Airdustrial Interchange to Trosper Road

Author:

Publisher:

Published: 1984

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

The purpose of this document is to determine the significance of potential environmental impacts resulting from the proposed action: the construction of a full-diamond interchange on SR 5 a half mile south of Israel Road at the extension of Airdustrial Way; adding two lanes in the existing median of SR 5; constructing a pedestrian undercrossing and connections in the vicinity of Bishop Road and Dennis Street; replacing the Israel Road undercrossing to provide adequate horizontal and vertical clearance; adding noise walls south of Trosper Road; and adding connections to Airdustrial Way and Littlerock Road.


I-5 Access Report

I-5 Access Report

Author:

Publisher:

Published: 1979

Total Pages: 152

ISBN-13:

DOWNLOAD EBOOK

The proposed project consists of improvements to existing Interstate Highway 5 from the Trosper Road interchange in Tumwater to the Martin Way interchange in Lacey. The proposal includes provisions for widening to three lanes of travel for both the northbound and southbound I-5 traffic, additions of new ramps, and revisions of existing ramps. --History and development of the route