Forecasting Highway Construction Staffing Requirements

Forecasting Highway Construction Staffing Requirements

Author: Timothy R. B. Taylor

Publisher:

Published: 2013

Total Pages: 92

ISBN-13:

DOWNLOAD EBOOK

"Adequate construction staffing is critical for performance of highway construction projects. The variable nature of these projects, however, can make it difficult to estimate construction staff requirements for both the short and long term. This study gathered information on the methods being used at highway transportation agencies to forecast staffing requirements. These methods are diverse and range from simple heuristics based on generic project types to multi-variate regression models developed from historical project data. Information for this study was acquired through a literature review, surveys of state transportation agencies, and site visits to non-state agencies. Timothy R.B. Taylor and William F. Maloney, University of Kentucky Department of Civil Engineering, Lexington, Kentucky, collected and synthesized the information and wrote the report. The members of the topic panel are acknowledged on the preceding page. This synthesis is an immediately useful document that records the practices that were acceptable with the limitations of the knowledge available at the time of its preparation. As progress in research and practice continues, new knowledge will be added to that now at hand"--Preface.


Completing the "Big Dig"

Completing the

Author: Transportation Research Board

Publisher: National Academies Press

Published: 2003-03-21

Total Pages: 60

ISBN-13: 0309088879

DOWNLOAD EBOOK

Boston's Central Artery/Tunnel Project, a 7.8 mile system of bridges and underground highways and ramps, is the most expensive public works project ever undertaken in the United States. The original cost estimate of $2.6 billion has already been exceeded by $12 billion, and the project will not be completed until 2005, seven years late. The Massachusetts Turnpike Authority (MTA), the public steward of the project, requested that the National Research Council carry out an independent assessment of the project's management and contract administration practices, with a focus on the present situation and measures that should be taken to bring the project to a successful conclusion. This report presents the committee's findings and recommendations pertaining to cost, scheduling, and transitioning from the current organization dominated by consultants to an operations organization composed largely of full-time MTA staff. The report recommends that MTA establish an external, independent, peer-review program to address technical and management issues until the transition to operations and maintenance is complete; begin a media campaign now to teach drivers how to use the new system safely; and develop, immediately implement, and maintain a comprehensive security program.


Impact to Alternative Contracting Methods Using Multivariate Analysis in the Regulatory Environment

Impact to Alternative Contracting Methods Using Multivariate Analysis in the Regulatory Environment

Author: Valerie Rose Riecke Smith

Publisher:

Published: 2008

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

This research addresses legislative impediments inherent to working in the government construction industry by investigating whether benefits exist when using alternative project delivery methods, and whether legislative limitations allowing the use of alternative project delivery methods impede any such benefits from being realized. The research begins by defining the project delivery method process, and explains in detail the four primary types and how they function. The research then provides a qualitative study that presents the perceived advantages and disadvantages of each method. Then, a second literature review provides an overview of previously published research in project delivery method selection, and examines federal and state legislative trends to establish the growing debate associated with alternative project delivery methods, focusing on the design-build method of project delivery. Finally, a quantitative analysis is presented to test whether federal and state legislative limitations influence the realization of any benefits of alternative project delivery methods, and specifically design-build, for federal projects. Project characteristics from the U.S. General Services Administration Capital Construction Project database are tested. The research suggests that when an alternative project delivery method, specifically design-build, is chosen, there are benefits in time and cost savings, and the ability to use the alternative project delivery method is affected by the removal of federal and state legislative impediments.


Model Rules of Professional Conduct

Model Rules of Professional Conduct

Author: American Bar Association. House of Delegates

Publisher: American Bar Association

Published: 2007

Total Pages: 216

ISBN-13: 9781590318737

DOWNLOAD EBOOK

The Model Rules of Professional Conduct provides an up-to-date resource for information on legal ethics. Federal, state and local courts in all jurisdictions look to the Rules for guidance in solving lawyer malpractice cases, disciplinary actions, disqualification issues, sanctions questions and much more. In this volume, black-letter Rules of Professional Conduct are followed by numbered Comments that explain each Rule's purpose and provide suggestions for its practical application. The Rules will help you identify proper conduct in a variety of given situations, review those instances where discretionary action is possible, and define the nature of the relationship between you and your clients, colleagues and the courts.


Discrete Choice Methods with Simulation

Discrete Choice Methods with Simulation

Author: Kenneth Train

Publisher: Cambridge University Press

Published: 2009-07-06

Total Pages: 399

ISBN-13: 0521766559

DOWNLOAD EBOOK

This book describes the new generation of discrete choice methods, focusing on the many advances that are made possible by simulation. Researchers use these statistical methods to examine the choices that consumers, households, firms, and other agents make. Each of the major models is covered: logit, generalized extreme value, or GEV (including nested and cross-nested logits), probit, and mixed logit, plus a variety of specifications that build on these basics. Simulation-assisted estimation procedures are investigated and compared, including maximum stimulated likelihood, method of simulated moments, and method of simulated scores. Procedures for drawing from densities are described, including variance reduction techniques such as anithetics and Halton draws. Recent advances in Bayesian procedures are explored, including the use of the Metropolis-Hastings algorithm and its variant Gibbs sampling. The second edition adds chapters on endogeneity and expectation-maximization (EM) algorithms. No other book incorporates all these fields, which have arisen in the past 25 years. The procedures are applicable in many fields, including energy, transportation, environmental studies, health, labor, and marketing.


Internal Evaluation

Internal Evaluation

Author: Arnold J. Love

Publisher: SAGE

Published: 1991-03

Total Pages: 174

ISBN-13: 9780803932012

DOWNLOAD EBOOK

This text provides an introduction to the theory and practice of internal evaluation. It presents the stages of internal evaluation growth, ways of identifying users' needs and selecting appropriate evaluation methods.