Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem, Including Santiago Creek. Volume 5. Oak Street Dam
Author: ARMY ENGINEER DISTRICT LOS ANGELES CA.
Publisher:
Published: 1988
Total Pages: 225
ISBN-13:
DOWNLOAD EBOOKThe recommended plan for Oak street Drain consists of a concrete channel beginning at the existing Oak Street debris basin and extending over 3 miles to the confluence with Temescal Wash. The channel is designed to provide 100-year level of protection. Total project first cost is estimated at $20,652,000. The economic data for the project is contained in Volume 9, 'Economics and Public Comment and Response.' (FR).