Safety Issue Resolution Strategy Plan for Inactive Miscellaneous Underground Storage Tanks
Author:
Publisher:
Published: 1994
Total Pages:
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author:
Publisher:
Published: 1994
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor: United States. Department of Energy. Richland Operations Office
Publisher:
Published: 2001
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1995
Total Pages: 74
ISBN-13:
DOWNLOAD EBOOKThe Program Management Plan (PMP) describes the approach that will be used to manage the Tank Waste Remediation System (TWRS) Inactive Miscellaneous Underground Storage Tank (IMUST) Program. The plan describes management, technical, and administrative control systems that will be used to plan and control the IMUSTs Program performance. The technical data to determine the IMUSTs status for inclusion in the Single Shell Tank Farm Controlled Clean and Stable (CCS) Program. The second is to identify and implement surveillance, characterization, stabilization, and modifications to support CCS prior to final closure.
Author:
Publisher:
Published: 1995
Total Pages: 560
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1997
Total Pages: 972
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1995
Total Pages: 632
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1998
Total Pages: 32
ISBN-13:
DOWNLOAD EBOOKThe purpose of this report is twofold. First, this report documents the technical evaluation supporting the Project Hanford Management Contract (PHMC) contractor recommendation to close the Unreviewed Safety Question (USQ) as originally evaluated in TF-94-0260, Soil Compaction Test Data Indicates Soil Density in Excess of Density Used in Tank Qualification Analysis for AP Tank Farm. Second, this report describes the status of existing structural analyses for the Tank Waste Remediation System (TWRS) waste storage structures and outlines the associated technical upgrades being considered by the contractor. This second feature of the report serves to communicate the distinction between the soil density issue which is the topic of the open USQ and other technical issues which are important to the contractor from a programmatic standpoint. Contractor actions to address the latter technical issues would support improvements in day-to-day operations (e.g., provide possible relaxations in soil load restrictions) but are not necessary to close the soil density USQ. Section 2.0 of this report documents the rationale for the PHMC contractor recommendation to the Department of Energy (DOE) to close the soil density USQ. Section 3.0 documents the recommended structural analyses improvements for the double-shell tanks (DSTs) which are the structures associated with the soil density USQ. Sections 4.0 and 5.0 provide, for completeness, the same information for single-shell tanks (SSTs), double-contained receiver tanks (DCRTs), catch tanks and inactive miscellaneous underground storage tanks (IMUSTs). Section 6.0 provides the conclusions of this report.
Author:
Publisher:
Published: 2012
Total Pages: 1098
ISBN-13:
DOWNLOAD EBOOKAuthor: James D. Condron
Publisher:
Published: 2002
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1997
Total Pages: 968
ISBN-13:
DOWNLOAD EBOOK