Review of the Draft Plan for the Modernization and Associated Restructuring Demonstration

Review of the Draft Plan for the Modernization and Associated Restructuring Demonstration

Author: National Research Council

Publisher: National Academies Press

Published: 1999-04-23

Total Pages: 30

ISBN-13: 0309064821

DOWNLOAD EBOOK

The public law that authorized the National Weather Service (NWS) to modernize its technical systems and restructure its field office organization set the requirements for what has become known as the modernization and associated restructuring demonstration (MARD). The law requires testing of the integrated performance, over a sustained period, of the modernized components and an operational demonstration that no degradation in service will result from the modernization and associated restructuring. In this report, the National Research Council's National Weather Service Modernization Committee reviews the September 1998 draft plan for MARD. The committee drew three conclusions from its review of the plan and offers five recommendations to the NWS.


Code of Federal Regulations

Code of Federal Regulations

Author:

Publisher:

Published: 1979

Total Pages: 692

ISBN-13:

DOWNLOAD EBOOK

Special edition of the Federal Register, containing a codification of documents of general applicability and future effect ... with ancillaries.


Review of the Draft Climate Science Special Report

Review of the Draft Climate Science Special Report

Author: National Academies of Sciences, Engineering, and Medicine

Publisher: National Academies Press

Published: 2017-05-30

Total Pages: 133

ISBN-13: 0309456673

DOWNLOAD EBOOK

The United States Global Change Research Program (USGCRP) is moving towards a sustained assessment process that allows for more fluid and consistent integration of scientific knowledge into the mandated quadrennial National Climate Assessment. As part of this process, the USGCRP is developing the Climate Science Special Report (CSSR), a technical report that details the current state-of-science relating to climate change and its physical impacts. The CSSR is intended to focus on climate change in the United States and to inform future USGCRP products. Review of the Draft Climate Science Special Report assesses whether the draft CSSR accurately presents the scientific literature in an understandable, transparent and traceable way; whether the CSSR authors handled the data, analyses, and statistical approaches in an appropriate manner; and the effectiveness of the report in conveying the information clearly for the intended audience. This report provides recommendations for how the draft CSSR could be strengthened.


Review of the Final Draft Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation

Review of the Final Draft Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation

Author: National Academies of Sciences, Engineering, and Medicine

Publisher: National Academies Press

Published: 2019-08-15

Total Pages: 81

ISBN-13: 0309495245

DOWNLOAD EBOOK

In 1943, as part of the Manhattan Project, the Hanford Nuclear Reservation was established with the mission to produce plutonium for nuclear weapons. During 45 years of operations, the Hanford Site produced about 67 metric tonnes of plutoniumâ€"approximately two-thirds of the nation's stockpile. Production processes generated radioactive and other hazardous wastes and resulted in airborne, surface, subsurface, and groundwater contamination. Presently, 177 underground tanks contain collectively about 210 million liters (about 56 million gallons) of waste. The chemically complex and diverse waste is difficult to manage and dispose of safely. Section 3134 of the National Defense Authorization Act for Fiscal Year 2017 calls for a Federally Funded Research and Development Center (FFRDC) to conduct an analysis of approaches for treating the portion of low-activity waste at the Hanford Nuclear Reservation intended for supplemental treatment. The third of four, this report provides an overall assessment of the FFRDC team's final draft report, dated April 5, 2019.