Reconnaissance Report, Section 205 Chattooga River Trion, Georgia, Chattooga County
Author:
Publisher:
Published: 1991
Total Pages: 151
ISBN-13:
DOWNLOAD EBOOKThe purpose of this study was to determine if planning should proceed to feasibility. The conclusion of the report indicates that raising the height of the existing levee built by the SCS in 1980, along with channel clearing, is an economically feasible plan. While we don't at this time have a sponsor, we are working toward a joint effort with the SCS to perform additional studies and construction of a project. This would be accomplished at 100 percent Federal cost.