Railway Signaling and Communications
Author:
Publisher:
Published: 1928
Total Pages: 508
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author:
Publisher:
Published: 1928
Total Pages: 508
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1961
Total Pages: 622
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1967
Total Pages: 554
ISBN-13:
DOWNLOAD EBOOKAuthor: F. Richard Yu
Publisher: CRC Press
Published: 2015-11-05
Total Pages: 280
ISBN-13: 1482257459
DOWNLOAD EBOOKWith rapid population explosion, improving rail transit speed and capacity is strongly desirable around the world. Communication-based train control (CBTC) is an automated train control system using high capacity bidirectional train-ground communications to ensure the safe operation of rail vehicles. This book presents the latest advances in CBTC r
Author: Ade Ogunsola
Publisher: Springer Science & Business Media
Published: 2012-08-14
Total Pages: 545
ISBN-13: 3642302815
DOWNLOAD EBOOKA railway is a complex distributed engineering system: the construction of a new railway or the modernisation of a existing one requires a deep understanding of the constitutive components and their interaction, inside the system itself and towards the outside world. The former covers the various subsystems (featuring a complex mix of high power sources, sensitive safety critical systems, intentional transmitters, etc.) and their interaction, including the specific functions and their relevance to safety. The latter represents all the additional possible external victims and sources of electromagnetic interaction. EMC thus starts from a comprehension of the emissions and immunity characteristics and the interactions between sources and victims, with a strong relationship to electromagnetics and to system modeling. On the other hand, the said functions are achieved and preserved and their relevance for safety is adequately handled, if the related requirements are well posed and managed throughout the process from the beginning. The link is represented by standards and their correct application, as a support to analysis, testing and demonstration.
Author:
Publisher:
Published: 1966
Total Pages: 570
ISBN-13:
DOWNLOAD EBOOKAuthor: Zhang-Dui Zhong
Publisher: Springer
Published: 2017-08-14
Total Pages: 354
ISBN-13: 3662548607
DOWNLOAD EBOOKThis book addresses the fundamental theory and key technologies of narrowband and broadband mobile communication systems specifically for railways. It describes novel relaying schemes that meet the different design criteria for railways and discusses the applications of signal classification techniques as well as offline resource scheduling as a way of advancing rail practice. Further, it introduces Novel Long Term Evolution for Railway (LTE-R) network architecture, the Quality of Service (QoS) requirement of LTE-R and its performance evaluation and discusses in detail security technologies for rail-dedicated mobile communication systems. The advanced research findings presented in the book are all based on high-speed railway measurement data, which offer insights into the propagation mechanisms and corresponding modeling theory and approaches in unique railway scenarios.It is a valuable resource for researchers, engineers and graduate students in the fields of rail traffic systems, telecommunication and information systems.
Author:
Publisher:
Published: 1957
Total Pages: 682
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher: Transportation Research Board
Published: 2012
Total Pages: 695
ISBN-13: 0309258243
DOWNLOAD EBOOKTCRP report 155 provides guidelines and descriptions for the design of various common types of light rail transit (LRT) track. The track structure types include ballasted track, direct fixation ("ballastless") track, and embedded track. The report considers the characteristics and interfaces of vehicle wheels and rail, tracks and wheel gauges, rail sections, alignments, speeds, and track moduli. The report includes chapters on vehicles, alignment, track structures, track components, special track work, aerial structures/bridges, corrosion control, noise and vibration, signals, traction power, and the integration of LRT track into urban streets.
Author: Great Britain: National Audit Office
Publisher: The Stationery Office
Published: 2006-11-22
Total Pages: 52
ISBN-13: 0102943729
DOWNLOAD EBOOKThis NAO report examines how effectively the Strategic Rail Authority/Department for Transport and Network Rail turned around the West Coast programme between 2002 and 2006 in terms of delivering outputs and expected outcomes in line with the schedule and targets set by the government and set out in the West Coast Main Line Strategy of June 2003. Three areas were examined in detail: how the Strategic Rail Authority/Department of Transport and Network Rail addressed the weaknesses in programme management before 2002 to achieve delivery to schedule; whether costs have been brought under control; whether the programme is delivering its anticipated benefits. A number of findings and conclusions have been set out, including: that the SRA and Network Rail did turn around the programme through an industry-supported strategy, reducing technology risk through reliance on conventional signalling for most of the upgrade; there were some implementation problems in two areas, axle counters and computer-based interlocking signalling, which resulted in an increase in costs; in general, Network Rail's control of costs has improved, but an analysis of its reported and forecast expenditure shows a final programme spend of £8.6 billion, with an overspend of around £300 million; for renewal work on the west coast route, Network Rail is within its overall funding allowance and on course to achieve 70% of the £940 million cost efficiencies assumed by the rail Regulator; at present the Strategic Rail Authority provides subsidies on an annual basis to Virgin West Coast of £590 million in 2005-06 period, this amount represents a payment needed to maintain train services and is outside the £8.6 billion; the project has delivered journey time improvements, with punctuality and train reliability on the West Coast having improved since 2005; in the 2005-06 period, passenger journeys on Virgin West Coast grew by over 20%, and the remaining work on the programme to 2009 will increase passenger train and freight capacity, but the consensus in the rail industry is that around 2015 to 2020, the line will have insufficient capacity to sustain current levels of growth in passenger and freight traffic; the overall strategy has delivered passenger benefits from a modernised track, but value for money for the programme has not been maximised. The report sets out a number of recommendations, including: that the Department in future should model and appraise costs and benefits for different options for the timing of delivery of the project; that the Department and the Office of Rail Regulation should further develop standard definitions for costs for different stages and elements of transport projects; where projects propose new technology at significant cost, the Department and ORR should ensure that Network Rail draws up a supporting business case, addressing costs, benefits and possible challenges along with a supporting implementation and maintenance strategy; the ORR should ensure Network Rail progresses its plans and adopts best practice strategy, and this approach should include a company-wide strategy that addresses whole life costs in its investment appraisal/project business cases, along with improved recording of maintenance and renewals costs for its equipment.