Santa Ana River Main Stem Including Santiago Creek and Oak Street Drain. Phase I GDM (General Design Memorandum). Appendix G. Recreation

Santa Ana River Main Stem Including Santiago Creek and Oak Street Drain. Phase I GDM (General Design Memorandum). Appendix G. Recreation

Author: ARMY ENGINEER DISTRICT LOS ANGELES CA.

Publisher:

Published: 1980

Total Pages: 140

ISBN-13:

DOWNLOAD EBOOK

This appendix is a preliminary study of recreation potentials that would be created by the proposed flood control projects. Included are demographic characteristics by the separate project areas; topographical, geological, and ecological features; market area analysis, both present and projected; inventory and analysis of existing costs, benefits and cost sharing projections; and identification of planning objectives for recreation and esthetic treatment and proposals for their accomplishment. (Author).


Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem, Including Santiago Creek. Volume 7. Hydrology

Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem, Including Santiago Creek. Volume 7. Hydrology

Author: ARMY ENGINEER DISTRICT LOS ANGELES CA.

Publisher:

Published: 1988

Total Pages: 257

ISBN-13:

DOWNLOAD EBOOK

This volume contains hydrologic information in support of the general design consideration for Seven Oaks Dam, Prado Dam, Santa Ana River mainstem between Seven Oaks Dam and Prado Dam, Mill Creek levee, Oak street Drain, Santiago Creek, and lower Santa Ana River. (FR).