Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale. Phase II. Quarterly Progress Report, September 1-November 30, 1979
Author:
Publisher:
Published: 1979
Total Pages:
ISBN-13:
DOWNLOAD EBOOKThe major activities at OOSI's Logan Wash site during the quarter were: driving the access drifts towards the underground locations for Retorts 7 and 8; manway raise boring; constructing the change house; rubbling the first lift of Mini-Retort (MR)1; preparing the Mini-Retorts for tracer testing; coring of Retort 3E; and beginning the DOE instrumentation program.