Long-Term Outlook for the U. S. Navy's Fleet

Long-Term Outlook for the U. S. Navy's Fleet

Author: Eric J. Labs

Publisher: DIANE Publishing

Published: 2010-05

Total Pages: 20

ISBN-13: 1437928226

DOWNLOAD EBOOK

Discusses the challenges that the Navy is facing in its plans for building its future fleet. This testimony examined these matters: (1) the Navy¿s draft shipbuilding plan for fiscal year 2011; (2) the effect that replacing Ohio class submarines with a new class of submarines will have on the Navy¿s shipbuilding program; and (3) the number of ships that may be needed to support ballistic missile defense from the sea. Before discussing those issues, the author briefly recaps an analysis of the 2009 shipbuilding plan as a point of departure for examining the draft 2011 plan. Charts and tables.


Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans

Author: Ronald O'Rourke

Publisher:

Published: 2020-11-14

Total Pages: 145

ISBN-13:

DOWNLOAD EBOOK

Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.


Learning War

Learning War

Author: Trent Hone

Publisher: Naval Institute Press

Published: 2018-06-15

Total Pages: 350

ISBN-13: 1682472949

DOWNLOAD EBOOK

Learning War examines the U.S. Navy’s doctrinal development from 1898–1945 and explains why the Navy in that era was so successful as an organization at fostering innovation. A revolutionary study of one of history’s greatest success stories, this book draws profoundly important conclusions that give new insight, not only into how the Navy succeeded in becoming the best naval force in the world, but also into how modern organizations can exploit today’s rapid technological and social changes in their pursuit of success. Trent Hone argues that the Navy created a sophisticated learning system in the early years of the twentieth century that led to repeated innovations in the development of surface warfare tactics and doctrine. The conditions that allowed these innovations to emerge are analyzed through a consideration of the Navy as a complex adaptive system. Learning War is the first major work to apply this complex learning approach to military history. This approach permits a richer understanding of the mechanisms that enable human organizations to evolve, innovate, and learn, and it offers new insights into the history of the United States Navy.


The Chinese Navy

The Chinese Navy

Author: Institute for National Strategic Studies

Publisher: Government Printing Office

Published: 2011-12-27

Total Pages: 348

ISBN-13: 9780160897634

DOWNLOAD EBOOK

Tells the story of the growing Chinese Navy - The People's Liberation Army Navy (PLAN) - and its expanding capabilities, evolving roles and military implications for the USA. Divided into four thematic sections, this special collection of essays surveys and analyzes the most important aspects of China's navel modernization.


Analysis of the Navy¿s Shipbuilding Plans

Analysis of the Navy¿s Shipbuilding Plans

Author: Eric J. Labs

Publisher: DIANE Publishing

Published: 2011-08

Total Pages: 31

ISBN-13: 1437982972

DOWNLOAD EBOOK

Statement of Eric J. Labs on the Navy¿s plans for its shipbuilding programs and corresponding budget. Contents: (1) Changes in Ship Requirements Under the 2011 Plan; (2) Ship Purchases and Inventories Under the 2011 Plan: Combat Ships; Logistics and Support Ships; (3) Ship Costs Under the 2011 Plan: The Navy¿s Estimates; CBO¿s Estimates; Changes from the 2009 Plan; (4) Outlook for Individual Ship Programs; Aircraft Carriers; Submarines; Large Surface Combatants; Littoral Combat Ships; Amphibious Ships. Charts and tables. This is a print on demand edition of an important, hard-to-find publication.


Navy Large Unmanned Surface and Undersea Vehicles

Navy Large Unmanned Surface and Undersea Vehicles

Author: Ronald O'Rourke

Publisher:

Published: 2019-06-24

Total Pages: 30

ISBN-13: 9781075833274

DOWNLOAD EBOOK

The Navy wants to develop and procure three new types of unmanned vehicles (UVs) in FY2020 and beyond-Large Unmanned Surface Vehicles (LUSVs), Medium Unmanned Surface Vehicles (MUSVs), and Extra-Large Unmanned Undersea Vehicles (XLUUVs). The Navy is requesting $628.8 million in FY2020 research and development funding for these three UV programs and their enabling technologies. The Navy wants to acquire these three types of UVs (which this report refers to collectively as large UVs) as part of an effort to shift the Navy to a new fleet architecture (i.e., a new combination of ships and other platforms) that is more widely distributed than the Navy's current architecture. Compared to the current fleet architecture, this more-distributed architecture is to include proportionately fewer large surface combatants (i.e., cruisers and destroyers), proportionately more small surface combatants (i.e., frigates and Littoral Combat Ships), and the addition of significant numbers of large UVs. The Navy wants to employ accelerated acquisition strategies for procuring these large UVs, so as to get them into service more quickly. The emphasis that the Navy placed on UV programs in its FY2020 budget submission and the Navy's desire to employ accelerated acquisition strategies in acquiring these large UVs together can be viewed as an expression of the urgency that the Navy attaches to fielding large UVs for meeting future military challenges from countries such as China. The LUSV program is a proposed new start project for FY2020. The Navy wants to procure two LUSVs per year in FY2020FY2024. The Navy wants LUSVs to be low-cost, high-endurance, reconfigurable ships based on commercial ship designs, with ample capacity for carrying various modular payloads-particularly anti-surface warfare (ASuW) and strike payloads, meaning principally anti-ship and land-attack missiles. The Navy reportedly envisions LUSVs as being 200 feet to 300 feet in length and having a full load displacement of about 2,000 tons. The MUSV program began in FY2019. The Navy plans to award a contract for the first MUSV in FY2019 and wants to award a contract for the second MUSV in FY2023. The Navy wants MUSVs, like LUSVs, to be low-cost, high-endurance, reconfigurable ships that can accommodate various payloads. Initial payloads for MUSVs are to be intelligence, surveillance and reconnaissance (ISR) payloads and electronic warfare (EW) systems. The Navy defines MUSVs as having a length of between 12 meters (about 39 feet) and 50 meters (about 164 feet). The Navy wants to pursue the MUSV program as a rapid prototyping effort under what is known as Section 804 acquisition authority. The XLUUV program, also known as Orca, was established to address a Joint Emergent Operational Need (JEON). The Navy wants to procure nine XLUUVs in FY2020-FY2024. The Navy announced on February 13, 2019, that it had selected Boeing to fabricate, test, and deliver the first four Orca XLUUVs and associated support elements. On March 27, 2019, the Navy announced that the award to Boeing had been expanded to include the fifth Orca. The Navy's large UV programs pose a number of oversight issues for Congress, including issues relating to the analytical basis for the more-distributed fleet architecture; the Navy's accelerated acquisition strategies and funding method for these programs; technical, schedule, and cost risk in the programs; the proposed annual procurement rates for the programs; the industrial base implications of the programs; the personnel implications of the programs; and whether the Navy has accurately priced the work it is proposing to do in FY2020 on the programs.