High Flux Isotope Reactor Quarterly Report, July, August, and September of 1976
Author:
Publisher:
Published: 1977
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAn extended shutdown to replace part of the beryllium reflector reduced the operating time for the quarter to 88 percent and the operating time for the year to 92.9 percent. The semiannual reactor component inspection was completed and the control plates were changed. Basic operating data for the quarter are listed.