High Flux Isotope Reactor Quarterly Report, July, August, and September of 1972
Author:
Publisher:
Published: 1972
Total Pages:
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author:
Publisher:
Published: 1972
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1967
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1975
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1973
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1972
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1977
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAn extended shutdown to replace part of the beryllium reflector reduced the operating time for the quarter to 88 percent and the operating time for the year to 92.9 percent. The semiannual reactor component inspection was completed and the control plates were changed. Basic operating data for the quarter are listed.
Author:
Publisher:
Published: 1973
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1982
Total Pages:
ISBN-13:
DOWNLOAD EBOOKRoutine reactor operation with four end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 91.3% for the quarter. The outer control plates and the inner control cylinder were changed and a semi-annual core component inspection was made.
Author:
Publisher:
Published: 1976
Total Pages: 724
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1967
Total Pages:
ISBN-13:
DOWNLOAD EBOOK