Oak Ridge Research Reactor Quarterly Report, April, May, and June 1981

Oak Ridge Research Reactor Quarterly Report, April, May, and June 1981

Author:

Publisher:

Published: 1982

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

The ORR operated at an average power level of 29.8 MW for 90.7% of the time during April, May, and June 1981. The reactor was shut down on eight occasions, one of which was unscheduled. Reactor downtime needed for refueling, maintenance, and checks was normal, with the reactor remaining available for operation 91.6% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature. In-service inspection completed during the quarter is described.


High Flux Isotope Reactor Quarterly Report April, May, and June of 1976

High Flux Isotope Reactor Quarterly Report April, May, and June of 1976

Author:

Publisher:

Published: 1976

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

Despite four end-of-cycle shutdowns during the reporting period, the reactor operated 95.6 percent of the time. This increased the on-stream time for the year to 95.3 percent. A test of the reactor bay in-leakage determined that an exhaust flow rate of 3,050 cfm is required to maintain a vacuum of 0.1 in. of water in this area.


High Flux Isotope Reactor. Quarterly Report, April, May, and June, 1979

High Flux Isotope Reactor. Quarterly Report, April, May, and June, 1979

Author:

Publisher:

Published: 1979

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

Routine reactor operation with four end-of-cycle shutdowns, one scheduled shutdown for analysis of servo problems, and one unscheduled shutdown resulted in an on-stream time of 87.4%. Scheduled reactor component replacement and the semiannual reactor component inspection were completed.


Government Reports Annual Index

Government Reports Annual Index

Author:

Publisher:

Published: 1982

Total Pages: 974

ISBN-13:

DOWNLOAD EBOOK

Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.