The purpose of this report is to provide the significant design, construction and operational information which can be used by engineers to (1) familiarize themselves with the project (2) reevaluate the embankment in the event unsatisfactory performance occurs and (3) provide guidance for designing comparable future projects. Contents: Introduction; Geology; Embankment and Foundation; Seepage Control; Slope Stability; Construction Notes; Instrumentation; Sterett Creek Dike; Operational Notes. (kr).