Final Work Plan for the Ordnance and Explosive (OE) Response Action for the Engineering Evaluation and Cost Analysis (EE/CA)
Author:
Publisher:
Published: 2005
Total Pages: 912
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author:
Publisher:
Published: 2005
Total Pages: 912
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2001
Total Pages: 768
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher: DIANE Publishing
Published: 2003
Total Pages: 46
ISBN-13: 1428941010
DOWNLOAD EBOOKAuthor: Bobby Bill
Publisher: Author House
Published: 2014-03
Total Pages: 341
ISBN-13: 1491899417
DOWNLOAD EBOOKA Presidio of San Francisco Closure Study began after the controversial Base Closure and Realignment Act of 1988 (BRAC 88) was enacted and placed the Presidio of San Francisco on the BRAC 88 Base Closure list. The required Presidio of San Francisco Closure Study, prepared by the Headquarters, Sixth US Army staff, tried to justify the continuance of the Presidio Post. This study continued for several years but eventually was ineffective bowing to political and military pressure and interference. This Case Study complements the Presidio of San Francisco Closure Study that overlaps the same time period that planned and programmed a systematic process where both management theory and assumptions could be applied to justify improvements in management competence, organizational improvements, and cost effectiveness. This Case Study contains a chronological history of events at the Presidio of San Francisco, and reviews a crisis precipitated by the Department of Defense (DOD) action under a Congressional mandate for Post and Base closures. This caused an administrative dilemma while concurrently, trying to plan the realignment of the Headquarters, Sixth US Army staff; discontinuance of the Presidio Garrison; closing the Presidio of San Francisco as a US Army military Installation; and transferring the Presidio Post operations, repair, and maintenance activities to the US National Park Service.
Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher:
Published: 1995
Total Pages: 2698
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1992
Total Pages: 592
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2000-03
Total Pages: 996
ISBN-13:
DOWNLOAD EBOOKAuthor: United States. Office of the Chief of Naval Operations
Publisher:
Published: 1990
Total Pages: 828
ISBN-13:
DOWNLOAD EBOOKAuthor: National Research Council
Publisher: National Academies Press
Published: 2013-02-27
Total Pages: 423
ISBN-13: 0309278139
DOWNLOAD EBOOKAcross the United States, thousands of hazardous waste sites are contaminated with chemicals that prevent the underlying groundwater from meeting drinking water standards. These include Superfund sites and other facilities that handle and dispose of hazardous waste, active and inactive dry cleaners, and leaking underground storage tanks; many are at federal facilities such as military installations. While many sites have been closed over the past 30 years through cleanup programs run by the U.S. Department of Defense, the U.S. EPA, and other state and federal agencies, the remaining caseload is much more difficult to address because the nature of the contamination and subsurface conditions make it difficult to achieve drinking water standards in the affected groundwater. Alternatives for Managing the Nation's Complex Contaminated Groundwater Sites estimates that at least 126,000 sites across the U.S. still have contaminated groundwater, and their closure is expected to cost at least $110 billion to $127 billion. About 10 percent of these sites are considered "complex," meaning restoration is unlikely to be achieved in the next 50 to 100 years due to technological limitations. At sites where contaminant concentrations have plateaued at levels above cleanup goals despite active efforts, the report recommends evaluating whether the sites should transition to long-term management, where risks would be monitored and harmful exposures prevented, but at reduced costs.