Fifty Years of Transuranic Waste at Savannah River Site

Fifty Years of Transuranic Waste at Savannah River Site

Author:

Publisher:

Published: 2002

Total Pages: 5

ISBN-13:

DOWNLOAD EBOOK

Three years into the Cold War, in 1950, President Truman asked the E.I. du Pont de Nemours Company to build and operate a plant to produce materials for nuclear weapons. This document covers 50 years of transuranic waste at Savannah River Site from production to cleanup.


Applied Environmental Technology Development at the Savannah River Site

Applied Environmental Technology Development at the Savannah River Site

Author:

Publisher:

Published: 2000

Total Pages: 5

ISBN-13:

DOWNLOAD EBOOK

Fifty years ago, the Savannah River Site (SRS) was built to produce nuclear materials. These operations impacted air, soil, groundwater, ecology and the local environment. Throughout its history, SRS has addressed these contamination issues directly and has maintained a strong commitment to environmental stewardship. The site boasts many environmental firsts. Notably, SRS was the first major DOE facility to perform a baseline ecological assessment. This pioneering effort, by Ruth Patrick and the Philadelphia Academy of Sciences, was performed during SRS planning and construction in the early 1950's. This unique early example sets the stage for subsequent efforts. Since that time, the scientists and engineers at SRS have proactively identified environmental problems as they occurred and have skillfully developed elegant and efficient solutions.


Review of the Department of Energy's Plans for Disposal of Surplus Plutonium in the Waste Isolation Pilot Plant

Review of the Department of Energy's Plans for Disposal of Surplus Plutonium in the Waste Isolation Pilot Plant

Author: National Academies of Sciences, Engineering, and Medicine

Publisher: National Academies Press

Published: 2020-06-01

Total Pages: 225

ISBN-13: 0309498619

DOWNLOAD EBOOK

In 2018, the National Academies of Sciences, Engineering, and Medicine issued an Interim Report evaluating the general viability of the U.S. Department of Energy's National Nuclear Security Administration's (DOE-NNSA's) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. It provided a preliminary assessment of the general viability of DOE-NNSA's conceptual plans, focused on some of the barriers to their implementation. This final report addresses the remaining issues and echoes the recommendations from the interim study.