Advances in Engineering Management, Innovation, and Sustainability
Author: James Olabode Bamidele Rotimi
Publisher: Springer Nature
Published:
Total Pages: 818
ISBN-13: 3031565444
DOWNLOAD EBOOKRead and Download eBook Full
Author: James Olabode Bamidele Rotimi
Publisher: Springer Nature
Published:
Total Pages: 818
ISBN-13: 3031565444
DOWNLOAD EBOOKAuthor: Amaresh Chakrabarti
Publisher: Springer Nature
Published: 2023-07-24
Total Pages: 1194
ISBN-13: 9819904285
DOWNLOAD EBOOKThis book showcases cutting-edge research papers from the 9th International Conference on Research into Design (ICoRD 2023) – the largest in India in this area – written by eminent researchers from across the world on design processes, technologies, methods and tools, and their impact on innovation, for supporting design for a connected world. The theme of ICoRD’23 has been ‘Design in the Era of Industry 4.0’. Industry 4.0 signifies the fourth industrial revolution. The first industrial revolution was driven by the introduction of mechanical power such as steam and water engines to replace human and animal labour. The second industrial revolution involved introduction of electrical power and organised labour. The third industrial revolution was powered by introduction of industrial automation. The fourth industrial revolution involves introduction of a combination of technologies to enable connected intelligence and industrial autonomy. The introduction of Industry 4.0 dramatically changes the landscape of innovation, and the way design, the engine of innovation, is carried out. The theme of ICoRD’23 - ‘Design in the Era of Industry 4.0’ –explores how Industry 4.0 concepts and technologies influence the way design is conducted, and how methods, tools, and approaches for supporting design can take advantage of this transformational change that is sweeping across the world. The book is of interest to researchers, professionals, and entrepreneurs working in the areas on industrial design, manufacturing, consumer goods, and industrial management who are interested in the new and emerging methods and tools for design of new products, systems, and services.
Author: Clarkson Hill Oglesby
Publisher: McGraw-Hill Companies
Published: 1989
Total Pages: 620
ISBN-13:
DOWNLOAD EBOOKAuthor: Carl Chiarella
Publisher: Springer Science & Business Media
Published: 2013-06-29
Total Pages: 487
ISBN-13: 3662040700
DOWNLOAD EBOOKIn this book on disequilibrium, growth and labor market dynamics we take predominantly a macroeconomic perspective. We present a working model that can easily be varied in different directions in order to subsume innovations in the literature on macroeconomics, old and new, and to contribute to important currently discussed macroeconomic issues. Our working model is set up in a way that there is a close relationship between our presented dynamic models and modern macro econometric models with disequilibrium both in the labor and the goods markets. One of our objectives is, therefore, to narrow the gap between theoretical and applied structural macrodynamic model building. We hope that the book will be a useful reference for all researchers, academic teachers and practitioners of macroeconomic and macro econometric model building who are interested in economic dynamics, independently of whether they use equilibrium or disequilibrium methods in their own research. We base this hope on the fact that our approach contains a number of unique features. The emphasis on the identification and analysis of the basic feedback mechanisms at work in modern macro economies. A detailed study of the partial as well as integrated dynamic interaction between these feedback mechanisms that consti tute the interdependence of markets and sectors of the modern macro economy. The rela tionship between the macroeconomic framework of our working model and the Walrasian, Non-Walrasian and New-Keynesian reformulations of macroeconomics.
Author: S. P. Dozzi
Publisher:
Published: 1993
Total Pages: 44
ISBN-13: 9780662211341
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2002
Total Pages: 776
ISBN-13:
DOWNLOAD EBOOKAuthor: Walter Krämer
Publisher: Springer Science & Business Media
Published: 2012-12-06
Total Pages: 134
ISBN-13: 3642484123
DOWNLOAD EBOOKEconometric models are made up of assumptions which never exactly match reality. Among the most contested ones is the requirement that the coefficients of an econometric model remain stable over time. Recent years have therefore seen numerous attempts to test for it or to model possible structural change when it can no longer be ignored. This collection of papers from Empirical Economics mirrors part of this development. The point of departure of most studies in this volume is the standard linear regression model Yt = x;fJt + U (t = I, ... , 1), t where notation is obvious and where the index t emphasises the fact that structural change is mostly discussed and encountered in a time series context. It is much less of a problem for cross section data, although many tests apply there as well. The null hypothesis of most tests for structural change is that fJt = fJo for all t, i.e. that the same regression applies to all time periods in the sample and that the disturbances u are well behaved. The well known Chow test for instance assumes t that there is a single structural shift at a known point in time, i.e. that fJt = fJo (t
Author: OECD
Publisher: OECD Publishing
Published: 2009-04-28
Total Pages: 556
ISBN-13: 9264044612
DOWNLOAD EBOOKPresents the proceedings of two workshops on productivity measurement and analysis, which brought together representatives of statistical offices, central banks and other officials involved with the analysis and measurement of productivity at aggregate and industry levels.
Author: National Research Council
Publisher: National Academies Press
Published: 2014-03-31
Total Pages: 267
ISBN-13: 0309288363
DOWNLOAD EBOOKPeople are constantly changing the land surface through construction, agriculture, energy production, and other activities. Changes both in how land is used by people (land use) and in the vegetation, rock, buildings, and other physical material that cover the Earth's surface (land cover) can be described and future land change can be projected using land-change models (LCMs). LCMs are a key means for understanding how humans are reshaping the Earth's surface in the past and present, for forecasting future landscape conditions, and for developing policies to manage our use of resources and the environment at scales ranging from an individual parcel of land in a city to vast expanses of forests around the world. Advancing Land Change Modeling: Opportunities and Research Requirements describes various LCM approaches, suggests guidance for their appropriate application, and makes recommendations to improve the integration of observation strategies into the models. This report provides a summary and evaluation of several modeling approaches, and their theoretical and empirical underpinnings, relative to complex land-change dynamics and processes, and identifies several opportunities for further advancing the science, data, and cyberinfrastructure involved in the LCM enterprise. Because of the numerous models available, the report focuses on describing the categories of approaches used along with selected examples, rather than providing a review of specific models. Additionally, because all modeling approaches have relative strengths and weaknesses, the report compares these relative to different purposes. Advancing Land Change Modeling's recommendations for assessment of future data and research needs will enable model outputs to better assist the science, policy, and decisionsupport communities.
Author:
Publisher:
Published: 1991
Total Pages: 572
ISBN-13:
DOWNLOAD EBOOK