Communication of Advanced Test Reactor Probabilistic Risk Assessment Results

Communication of Advanced Test Reactor Probabilistic Risk Assessment Results

Author:

Publisher:

Published: 1992

Total Pages: 4

ISBN-13:

DOWNLOAD EBOOK

The Advanced Test Reactor (ATR) probabilistic risk assessment (PRA) Level 1 results were efficiently communicated in two reports following the completion of revision 1 of the ATR PRA. As the ATR PRA including external events fills four large volume, it was considered impractical to expect all of the individuals at ATR who could benefit from the information to read the entire PRA. Even though many ATR personnel received training in PRA methodology and were involved in some aspects of the PRA, another hinderance to effective communication of the PRA results is that the PRA was written and organized to meet the requirements of practitioners and reviewers who are well-versed in PRA methods. Therefore, two PRA summary reports, an ATR risk summary report and an ATR functional group summary report, were written to communicate the ATR PRA results and insights to interested ATR personnel.


Advanced Test Reactor Probabilistic Risk Assessment Methodology and Results Summary

Advanced Test Reactor Probabilistic Risk Assessment Methodology and Results Summary

Author:

Publisher:

Published: 1992

Total Pages: 100

ISBN-13:

DOWNLOAD EBOOK

The Advanced Test Reactor (ATR) probabilistic risk assessment (PRA) Level 1 report documents a comprehensive and state-of-the-art study to establish and reduce the risk associated with operation of the ATR, expressed as a mean frequency of fuel damage. The ATR Level 1 PRA effort is unique and outstanding because of its consistent and state-of-the-art treatment of all facets of the risk study, its comprehensive and cost-effective risk reduction effort while the risk baseline was being established, and its thorough and comprehensive documentation. The PRA includes many improvements to the state-of-the-art, including the following: establishment of a comprehensive generic data base for component failures, treatment of initiating event frequencies given significant plant improvements in recent years, performance of efficient identification and screening of fire and flood events using code-assisted vital area analysis, identification and treatment of significant seismic-fire-flood-wind interactions, and modeling of large loss-of-coolant accidents (LOCAs) and experiment loop ruptures leading to direct damage of the ATR core. 18 refs.


Advanced Test Reactor Probabilistic Risk Assessment

Advanced Test Reactor Probabilistic Risk Assessment

Author:

Publisher:

Published: 1993

Total Pages: 6

ISBN-13:

DOWNLOAD EBOOK

This report discusses Level 1 probabilistic risk assessment (PRA) incorporating a full-scope external events analysis which has been completed for the Advanced Test Reactor (ATR) located at the Idaho National Engineering Laboratory.


Review and Updates of the Risk Assessment for Advanced Test Reactor Operations for Operating Events and Experience

Review and Updates of the Risk Assessment for Advanced Test Reactor Operations for Operating Events and Experience

Author:

Publisher:

Published: 1996

Total Pages: 9

ISBN-13:

DOWNLOAD EBOOK

Annual or biannual reviews of the operating history of the Advanced Test Reactor (ATR) at the Idaho National Engineering Laboratory (INEL) have been conducted for the purpose of reviewing and updating the ATR probabilistic safety assessment (PSA) for operating events and operating experience since the first compilation of plant- specific experience data for the ATR PSA which included data for operation from initial power operation in 1969 through 1988. This technical paper briefly discusses the means and some results of these periodic reviews of operating experience and their influence on the ATR PSA.


Advanced Test Reactor Outage Risk Assessment

Advanced Test Reactor Outage Risk Assessment

Author:

Publisher:

Published: 1997

Total Pages: 6

ISBN-13:

DOWNLOAD EBOOK

Beginning in 1997, risk assessment was performed for each Advanced Test Reactor (ATR) outage aiding the coordination of plant configuration and work activities (maintenance, construction projects, etc.) to minimize the risk of reactor fuel damage and to improve defense-in-depth. The risk assessment activities move beyond simply meeting Technical Safety Requirements to increase the awareness of risk sensitive configurations, to focus increased attention on the higher risk activities, and to seek cost-effective design or operational changes that reduce risk. A detailed probabilistic risk assessment (PRA) had been performed to assess the risk of fuel damage during shutdown operations including heavy load handling. This resulted in several design changes to improve safety; however, evaluation of individual outages had not been performed previously and many risk insights were not being utilized in outage planning. The shutdown PRA provided the necessary framework for assessing relative and absolute risk levels and assessing defense-in-depth. Guidelines were written identifying combinations of equipment outages to avoid. Screening criteria were developed for the selection of work activities to receive review. Tabulation of inherent and work-related initiating events and their relative risk level versus plant mode has aided identification of the risk level the scheduled work involves. Preoutage reviews are conducted and post-outage risk assessment is documented to summarize the positive and negative aspects of the outage with regard to risk. The risk for the outage is compared to the risk level that would result from optimal scheduling of the work to be performed and to baseline or average past performance.


PSA '93

PSA '93

Author: American Nuclear Society

Publisher:

Published: 1993

Total Pages: 764

ISBN-13:

DOWNLOAD EBOOK