In the Matter of the Application of Basin Electric Power Cooperative for a Certificate of Corridor Compatibility for Two (2) 345 KV Transmission Lines Between Antelope Valley Station and Leland Olds Station in Mercer County, North Dakota, and One (1) 345/500 KV Transmission Line Between Antelope Valley Station in Mercer County, North Dakota and a Basin Electric Substation Near Huron in Beadle County, South Dakota

In the Matter of the Application of Basin Electric Power Cooperative for a Certificate of Corridor Compatibility for Two (2) 345 KV Transmission Lines Between Antelope Valley Station and Leland Olds Station in Mercer County, North Dakota, and One (1) 345/500 KV Transmission Line Between Antelope Valley Station in Mercer County, North Dakota and a Basin Electric Substation Near Huron in Beadle County, South Dakota

Author: Basin Electric Power Cooperative

Publisher:

Published: 1978

Total Pages:

ISBN-13:

DOWNLOAD EBOOK