USGS and Engineering and Environmental Division Joint Compliance Monitoring Report for Sacramento, CA Municipal Utility District's SMUDGEO No. 1 Geothermal Project. Appendix D to Final Decision

USGS and Engineering and Environmental Division Joint Compliance Monitoring Report for Sacramento, CA Municipal Utility District's SMUDGEO No. 1 Geothermal Project. Appendix D to Final Decision

Author:

Publisher:

Published: 1981

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

The laws, ordinances, standards, and conditions for designing, constructing, and operating the power plant and related facilities are referenced. In addition, actions, verifications, submittals, and approvals required by the USGS, BLM, and CEC are specified to assure that the facilities are designed, constructed, and operated in compliance with air and water quality, public health and safety, environmental and such other laws, ordinances, and standards specified. (MHR).