US-34, Replacement of Burlington Bridge Over Mississippi River, Des Moines County, IA/Henderson County, IL, FONSI.
Author:
Publisher:
Published: 1986
Total Pages: 126
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author:
Publisher:
Published: 1986
Total Pages: 126
ISBN-13:
DOWNLOAD EBOOKAuthor: United States. Federal Highway Administration
Publisher:
Published: 1986
Total Pages: 156
ISBN-13:
DOWNLOAD EBOOKAuthor: Iowa. Highway Division
Publisher:
Published: 1985
Total Pages: 154
ISBN-13:
DOWNLOAD EBOOKThis Design Study Report presents the investigations made for the replacement of the MacArthur Bridge and its approaches in the States of Iowa and Illinois for US Route 34. The study area included all roadway and structures from the Central Avenue Bridge over US-34 in Iowa to the Burlington Northern railroad bridge in Illinois. The replacement river structure is set 75 ft downstream from the centerline of the existing bridge to the centerline of proposed US 34. The project is divided into three sections for the study. These are the Iowa Approach up to the first land pier for the river bridge, the river bridge from the first land pier in Iowa to the abutment on the river side of the Henderson County Levee, and the Illinois Approach from the river bridge abutment to the Burlington Northern railroad overpass. The selection of a structural concept for the river bridge has little or no affect on the construction cost of roadway items, demolition and structures at the Burlington Interchange which will be $2,993,000. For the river crossing, four concepts for the channel span-- a truss, a tied arch, and cable-stayed girders in steel and concrete--were investigated. Multiple girders in steel and in prestressed concrete and post-tensioned concrete box girder approaches were evaluated in conjunction with the channel span schemes. Based on estimated construction costs, which out-weigh other considerations, it is recommended that a simple span through truss with multiple prestressed concrete approach spans be constructed for an expenditure of $30,039,000. As multiple steel girders are competitive with multiple prestressed concrete girders, for the approach spans, it is further recommended that an alternate design be prepared for that portion of the structure. The construction cost for the Illinois approach has a minor impact from the selection of a river bridge concept and for the recommended scheme would be $2,956,000.
Author:
Publisher:
Published: 2010
Total Pages: 918
ISBN-13:
DOWNLOAD EBOOKAuthor: United States. Office of the Federal Register
Publisher:
Published: 1992
Total Pages: 132
ISBN-13:
DOWNLOAD EBOOKAuthor: United States. Congress. House. Committee on Appropriations. Subcommittee on Department of the Interior and Related Agencies
Publisher:
Published: 1989
Total Pages: 816
ISBN-13:
DOWNLOAD EBOOKAuthor: United States. Federal Aviation Administration
Publisher:
Published: 1989
Total Pages: 40
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1982
Total Pages: 44
ISBN-13:
DOWNLOAD EBOOKAuthor: NVLAP (Program : U.S.)
Publisher:
Published: 2002
Total Pages: 524
ISBN-13:
DOWNLOAD EBOOKAuthor: Craig Finn
Publisher:
Published: 2021-03-03
Total Pages:
ISBN-13: 9781736314708
DOWNLOAD EBOOKIllustrator Andrew Greenstone interprets the lyrics of singer/songwriter and frontman of The Hold Steady, Craig Finn. This deluxe edition of the original comic book includes additional bonus material.