Eastern Extension of the George Bush Turnpike from SH 78 to IH 30, Dallas County
Author:
Publisher:
Published: 2004
Total Pages: 472
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author:
Publisher:
Published: 2004
Total Pages: 472
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1996
Total Pages: 658
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2005
Total Pages: 1070
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1998
Total Pages: 84
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2002
Total Pages: 516
ISBN-13:
DOWNLOAD EBOOKAuthor: Erik Slotboom
Publisher:
Published: 2014-04-01
Total Pages: 540
ISBN-13: 9780974160511
DOWNLOAD EBOOKHistory of Dallas-Fort Worth freeways and associated landmarks and events
Author: James D. Carvell
Publisher:
Published: 1996
Total Pages: 202
ISBN-13:
DOWNLOAD EBOOKThis report documents the development of a comprehensive plan for implementation of Intelligent Transportation Systems in the Dallas area. Objectives, findings, and recommendations are summarized as follows: 1. Develop a Broadly Based Steering Committee - A committee was formed with representatives from various transportation-related agencies including ten cities, Texas Department of Transportation (TxDOT), Dallas County, Dallas Area Rapid Transit, North Central Texas Council of Governments, FHWA, universities, several consultants, and other private sector companies. 2. Assess Existing TMS and Potential ITS Technology - An inventory of existing traffic management systems and transportation facilities was compiled. Thirty of the cities in the study area were surveyed to determine incident management procedures and to identify particular problems or needs. 3. Identify Institutional Issues and Legal Barriers - A workshop was held to examine any potential institutional issues which might be barriers to area-wide traffic management. It was generally agreed that a regional concept was essential, but not necessarily as a regional control center. The cities still wanted to have control of traffic management within their particular jurisdiction but were open to cooperative operation for incident conditions across city limit lines. Under incident conditions, predetermined, jointly developed signal timing plans would be called for from a Dallas Area Transportation Management Center (DATMC). 4. Develop an Implementable, Area-Wide Multi-Jurisdictional ITS Plan - Projects are defined for both freeway and surface street systems. Included are ATMS, ATIS, APTS, AVSS (AVCS), and CVO elements and their interaction. The DATMC will be operated by TxDOT but with sharing of video images and traffic data among the various operating issues over a wide-area network. Since a communications backbone network will not be in place for some time, much of the CCTV system will initially be in compressed video format transmitted over leased ISDN lines. The recommended plan reflects both State and National Architecture efforts. 5. Develop Costs, Benefits, and an Implementation Plan - Costs, benefits, and a staged implementation plan were developed and emphasize near-term improvements to incident management procedures, mobility assistance patrol upgrades, and other ITS elements. A medium- and long-term implementation plan is specified. A benefit:cost ratio of 17:1 was estimated for the recommended plan.
Author:
Publisher:
Published: 1997
Total Pages: 420
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1984
Total Pages: 176
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1991
Total Pages: 1534
ISBN-13:
DOWNLOAD EBOOK