Report of the Transit Department for Eleven Months Ending December 31, 1925 (Classic Reprint)
Author: Boston Transit Department
Publisher: Forgotten Books
Published: 2018-02-18
Total Pages: 102
ISBN-13: 9780656840632
DOWNLOAD EBOOKExcerpt from Report of the Transit Department for Eleven Months Ending December 31, 1925 The extension of the Dorchester tunnel, known as Section K, and under construction at the time the previous report was issued, was completed by Coleman Bros., Inc., on October 29, 1925, several months ahead of the contract time. Much of the work on this section was difficult, calling for a high degree of skill and care. A considerable part was constructed diagon ally under the four main line tracks of the Boston division of the New York, New Haven Hartford Railroad Company which carry an exceedingly heavy passenger and freight traffic. The work. Included the supporting of the abutments of the Boston Street bridge and the construction Of a new bridge in Dorchester avenue. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.