This is part of the Tank Waste Projects (TWP) Quality Assurance Program Plan. This document and the Tank Waste Projects QAPP describe the program and the planned actions which WHC will implement, demonstrate and ensure that the project meets the requirements of 10 CFR 830.120. Purpose of Project W058, Replacement Cross-Site Transfer System, is to replace the existing cross-site transfer system for transferring waste (via pipeline) in support of the Hanford Site clean-up mission. The transfers will be made from 200 East and 200 West tank farms to treatment, storage, and disposal facilities in the 200 East Area. The new system will consist of a pipe-in-pipe connecting the 241-SY A and B valve pits in the 200 West Area with the 244-A Lift Station in the 200 East Area. The work to be accomplished by W-058 and covered by this QAPP includes diversion box, vent station, piping, booster pump, backup flush system, power lines.


Baseline Comparison Report for Project W-058, Replacement of the Cross-site Transfer System

Baseline Comparison Report for Project W-058, Replacement of the Cross-site Transfer System

Author:

Publisher:

Published: 1996

Total Pages: 32

ISBN-13:

DOWNLOAD EBOOK

This BCR compares the Project W-058 Functional Design Criteria with the Project W-058 Preliminary Design Requirements Document, and identifies the differences between the two documents in the mission definition, project requirements, system functions, and interfaces. Impacts these differences have on current project design are also discussed.


Baseline Comparison Report for Project W-058, Replacement of the Cross-site Transfer System. Revision 1

Baseline Comparison Report for Project W-058, Replacement of the Cross-site Transfer System. Revision 1

Author:

Publisher:

Published: 1995

Total Pages: 33

ISBN-13:

DOWNLOAD EBOOK

This BCR compares the Project W-058 Functional Design Criteria with the Project W-058 Preliminary Design Requirements Document, and identifies the differences between the two documents in the mission definition, project requirements, system functions, and interfaces. Impacts these differences have on current project design are also discussed.