Natural Resource Risk and Cost Management in Environmental Restoration

Natural Resource Risk and Cost Management in Environmental Restoration

Author:

Publisher:

Published: 1995

Total Pages: 10

ISBN-13:

DOWNLOAD EBOOK

The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff's understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues.


Implementation of the Natural Resource Damage Assessment Rule. Workshop Summary ; Interim Notification Policy

Implementation of the Natural Resource Damage Assessment Rule. Workshop Summary ; Interim Notification Policy

Author:

Publisher:

Published: 1991

Total Pages: 43

ISBN-13:

DOWNLOAD EBOOK

Regulations have been promulgated by the Department of Interior (DOI) which provide an administrative process whereby natural resource trustees may establish the type and extent of injury and evaluate the damages to natural resources. These regulations provide an optional mechanism for Natural Resource Damage Assessments (NRDAs), with four major components. A workshop was held to develop recommendations for DOE-OR regarding implementation of the DOI NRDA regulations at the Oak Ridge Reservation (ORR). The attendants were divided into three working groups to consider (1) administrative/legal requirements, (2) ecological assessments, and (3) the NRDA/economic evaluation process. This report supplies an overview of the DOI NRDA regulations as well as summaries of the consensus of each of the three working groups.


Ecological Risk Assessment for Contaminated Sites

Ecological Risk Assessment for Contaminated Sites

Author: Glenn W. Suter II

Publisher: CRC Press

Published: 2000-04-21

Total Pages: 466

ISBN-13: 9781420056693

DOWNLOAD EBOOK

Love Canal. Exxon Valdez. Times Beach. Sacramento River Spill. Amoco Cadiz. Seveso. Every area of the world has been affected by improper waste disposal and chemical spills. Common hazardous waste sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills. These sites poison the land and contaminate groundwater and drinking water. A sequel to the bestselling Ecological Risk Assessment, Ecological Risk Assessment for Contaminated Sites focuses on how to perform ecological risk assessments for Superfund sites and locations contaminated by improper disposal of wastes, or chemical spills. It integrates the authors' extensive experience in assessing ecological risks at U.S. government sites with techniques and examples from assessments performed by others. Conducting an ecological risk assessment on a contaminated site provides the information needed to make decisions concerning site remediation. The first rule of good risk assessment is "don't do anything stupid". With the practical preparation you get from Ecological Risk Assessment for Contaminated Sites you won't.


The Natural Resource Damage Assessment Deskbook

The Natural Resource Damage Assessment Deskbook

Author: Valerie Ann Lee

Publisher: Environmental Law Institute

Published: 2002

Total Pages: 330

ISBN-13: 9781585760404

DOWNLOAD EBOOK

This book provides a comprehensive survey of the law and techniques associated with the law, science, and economics involved in natural resource damage assessment. Written by experts in the field, this new deskbook is the most comprehensive and up-to-date analysis of the subject available. It thoroughly examines the framework for liability and the goals of the federal statutes providing a right of action for natural resource damages. Focus is maintained on the natural resource damage provisions of CERCLA; the Oil Pollution Act; the Clean Water Act; the Marine Protection, Sanctuaries, and Research Act; and the National Park System Resource Protection Act.


Systems Analysis and Systems Engineering in Environmental Remediation Programs at the Department of Energy Hanford Site

Systems Analysis and Systems Engineering in Environmental Remediation Programs at the Department of Energy Hanford Site

Author: National Research Council

Publisher: National Academies Press

Published: 1998-08-21

Total Pages: 62

ISBN-13: 0309173809

DOWNLOAD EBOOK

The primary purpose of systems engineering is to organize information and knowledge to assist those who manage, direct, and control the planning, development, production, and operation of the systems necessary to accomplish a given mission. However, this purpose can be compromised or defeated if information production and organization becomes an end unto itself. Systems engineering was developed to help resolve the engineering problems that are encountered when attempting to develop and implement large and complex engineering projects. It depends upon integrated program planning and development, disciplined and consistent allocation and control of design and development requirements and functions, and systems analysis. The key thesis of this report is that proper application of systems analysis and systems engineering will improve the management of tank wastes at the Hanford Site significantly, thereby leading to reduced life cycle costs for remediation and more effective risk reduction. The committee recognizes that evidence for cost savings from application of systems engineering has not been demonstrated yet.