In the Matter of the Application of Basin Electric Power Cooperative for a Waiver of Procedures Under the Energy Conversion and Transmission Facility Siting Act Regarding the Proposed Construction and Operation of Approximately 70 Miles of a 345 KV AC Electric Transmission Facility Extending from the Antelope Valley Substation in Mercer County, North Dakota, to the Charlie Creek Substation in McKenzie County, North Dakota, Case

In the Matter of the Application of Basin Electric Power Cooperative for a Waiver of Procedures Under the Energy Conversion and Transmission Facility Siting Act Regarding the Proposed Construction and Operation of Approximately 70 Miles of a 345 KV AC Electric Transmission Facility Extending from the Antelope Valley Substation in Mercer County, North Dakota, to the Charlie Creek Substation in McKenzie County, North Dakota, Case

Author: Basin Electric Power Cooperative

Publisher:

Published: 1981

Total Pages: 26

ISBN-13:

DOWNLOAD EBOOK


In the Matter of the Application of Basin Electric Power Cooperative for a Certificate of Corridor Compatibility for Two (2) 345 KV Transmission Lines Between Antelope Valley Station and Leland Olds Station in Mercer County, North Dakota, and One (1) 345/500 KV Transmission Line Between Antelope Valley Station in Mercer County, North Dakota and a Basin Electric Substation Near Huron in Beadle County, South Dakota

In the Matter of the Application of Basin Electric Power Cooperative for a Certificate of Corridor Compatibility for Two (2) 345 KV Transmission Lines Between Antelope Valley Station and Leland Olds Station in Mercer County, North Dakota, and One (1) 345/500 KV Transmission Line Between Antelope Valley Station in Mercer County, North Dakota and a Basin Electric Substation Near Huron in Beadle County, South Dakota

Author: Basin Electric Power Cooperative

Publisher:

Published: 1978

Total Pages:

ISBN-13:

DOWNLOAD EBOOK


In the Matter of the Application of Otter Tail Power Company for a Certificate of Site Compatibility for a Water Transmission Pipeline Corridor and for a Route Permit for the Construction of a Water Transmission Pipeline Facility which Will Consist of a 36-inch Makeup Water Line from the Missouri River to Coyote Station Generating Unit No. 1 and a 12 and 14-inch Blowdown Pipeline from the Coyote Station Generating Plant Back to the Missouri River

In the Matter of the Application of Otter Tail Power Company for a Certificate of Site Compatibility for a Water Transmission Pipeline Corridor and for a Route Permit for the Construction of a Water Transmission Pipeline Facility which Will Consist of a 36-inch Makeup Water Line from the Missouri River to Coyote Station Generating Unit No. 1 and a 12 and 14-inch Blowdown Pipeline from the Coyote Station Generating Plant Back to the Missouri River

Author: Otter Tail Power Company

Publisher:

Published: 1978

Total Pages:

ISBN-13:

DOWNLOAD EBOOK