I-494, 24th Ave to Mississippi River Bridge, Bloomington-St.Paul
Author:
Publisher:
Published: 1979
Total Pages: 250
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author:
Publisher:
Published: 1979
Total Pages: 250
ISBN-13:
DOWNLOAD EBOOKAuthor: Minnesota. Department of Transportation
Publisher:
Published: 1979
Total Pages: 242
ISBN-13:
DOWNLOAD EBOOKAuthor: Minnesota. Department of Transportation. Division of Highways
Publisher:
Published: 1977
Total Pages: 146
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1980
Total Pages: 1310
ISBN-13:
DOWNLOAD EBOOKCurrent developments: a weekly review of pollution control and related environmental management problems -- Decisions (later published in bound volumes. Environment reporter. Cases) --Monographs -- Federal laws -- Federal regulations --State air laws -- State water laws -- State solid waste, land use laws -- Mining.
Author: Library of Congress. Exchange and Gift Division
Publisher:
Published: 1979
Total Pages: 804
ISBN-13:
DOWNLOAD EBOOKJune and Dec. issues contain listings of periodicals.
Author: Minnesota. Department of Transportation. Field Operations Division
Publisher:
Published: 1979
Total Pages:
ISBN-13:
DOWNLOAD EBOOKThis report is submitted to fulfill the requirements of a Location/design study report as identified in the Mn/DOT action plan and the Federal-aid highway program manual 7-7-5. It is also the last step before the final design and construction of this segment of I-494 and is a product of years of planning and coordination involving Mn/DOT, the local municipalities and many other agencies. The proposed project is an 11 mile segment of I-494, located in Hennepin and Dakota Counties. It begins near 24th Avenue in Bloomington and ends at the Mississippi River Bridge in South St. Paul and is the only uncompleted section of the I-494-694 Metropolitan Beltline. The first phase of construction of the project is proposed for 1980. The finished highway is scheduled for opening to traffic in 1984.