Hanford Waste Vitrification Plant Technical Manual
Author: R. A. Watrous
Publisher:
Published: 1996
Total Pages:
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author: R. A. Watrous
Publisher:
Published: 1996
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1990
Total Pages: 0
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1981
Total Pages: 556
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1993
Total Pages: 298
ISBN-13:
DOWNLOAD EBOOKWestinghouse Hanford Company (WHC) is the Integrating Contractor for the Hanford Waste Vitrification Plant (HWVP) Project, and as such is responsible for preparation of the HWVP Preliminary Safety Analysis Report (PSAR). The HWVP PSAR was prepared pursuant to the requirements for safety analyses contained in US Department of Energy (DOE) Orders 4700.1, Project Management System (DOE 1987); 5480.5, Safety of Nuclear Facilities (DOE 1986a); 5481.lB, Safety Analysis and Review System (DOE 1986b) which was superseded by DOE order 5480-23, Nuclear Safety Analysis Reports, for nuclear facilities effective April 30, 1992 (DOE 1992); and 6430.lA, General Design Criteria (DOE 1989). The WHC procedures that, in large part, implement these DOE requirements are contained in WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual. This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals.
Author: W. H. Caplinger
Publisher:
Published: 1990
Total Pages: 5
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1991
Total Pages: 45
ISBN-13:
DOWNLOAD EBOOKThe requirements for Westinghouse Hanford independent review of the Preliminary Safety Analysis Report (PSAR) are contained in Section 1.0, Subsection 4.3 of WCH-CM-4-46. Specifically, this manual requires the following: (1) Formal functional reviews of the HWVP PSAR by the future operating organization (HWVP Operations), and the independent review organizations (HWVP and Environmental Safety Assurance, Environmental Assurance, and Quality Assurance); and (2) Review and approval of the HWVP PSAR by the Tank Waste Disposal (TWD) Subcouncil of the Safety and Environmental Advisory Council (SEAC), which provides independent advice to the Westinghouse Hanford President and executives on matters of safety and environmental protection. 7 refs.
Author: John F. Bores
Publisher:
Published: 1993
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1997
Total Pages: 972
ISBN-13:
DOWNLOAD EBOOKAuthor: William L. Kuhn
Publisher:
Published: 1996
Total Pages: 21
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1993
Total Pages: 118
ISBN-13:
DOWNLOAD EBOOKThe Hanford Waste Vitrification Plant Project has been established to convert the high-level radioactive waste associated with nuclear defense production at the Hanford Site into a waste form suitable for disposal in a deep geologic repository. The Hanford Waste Vitrification Plant will mix processed radioactive waste with borosilicate material, then heat the mixture to its melting point (vitrification) to forin a glass-like substance that traps the radionuclides in the glass matrix upon cooling. The Hanford Waste Vitrification Plant Quality Assurance Program has been established to support the mission of the Hanford Waste Vitrification Plant. This Quality Assurance Program Description has been written to document the Hanford Waste Vitrification Plant Quality Assurance Program.