Final Remedial Design Report and Work Plan for Operable
Author: Montgomery Watson (Firm)
Publisher:
Published: 1997
Total Pages:
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author: Montgomery Watson (Firm)
Publisher:
Published: 1997
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor: United States. Department of Energy. Richland Operations Office
Publisher:
Published: 2002
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1990
Total Pages: 64
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1997
Total Pages: 146
ISBN-13:
DOWNLOAD EBOOKThe 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.
Author:
Publisher:
Published: 2001
Total Pages: 1476
ISBN-13:
DOWNLOAD EBOOKAuthor: United States. Department of Energy. Richland Operations Office
Publisher:
Published: 1996
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 1996
Total Pages: 682
ISBN-13:
DOWNLOAD EBOOKAuthor: CH2M Hill (Firm : Salt Lake City, Utah)
Publisher:
Published: 1999
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor: D. E. Shanklin
Publisher:
Published: 2006
Total Pages:
ISBN-13:
DOWNLOAD EBOOKThis Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.