The Congressional Record is the official record of the proceedings and debates of the United States Congress. It is published daily when Congress is in session. The Congressional Record began publication in 1873. Debates for sessions prior to 1873 are recorded in The Debates and Proceedings in the Congress of the United States (1789-1824), the Register of Debates in Congress (1824-1837), and the Congressional Globe (1833-1873)
Also includes some descendants of Otto Beery. He was born in 1859 at Langnau, Berne, Switzerland and immigrated to the United States ca. 1885. He married Mary McCleary in 1890 at Passaic, New Jersey. They had five children, 1891-1906. He died in 1918 at Wallington, New Jersey.
This is volume one of four. This very rare and long out of print biographical work is a must for any Mason with a desire for Masonic research. This is NOT a photocopy of the original work, but a completely new, re-type set edition. While a few editorial changes have been made the work is for the most part as it was when first published. The largest change is the addenda that was at the end of the 4th edition. The addenda was a collection of corrections and additions to the work. We have incorporated the corrections and additions into the work itself removing the need for the addenda. DON'T FORGET: This is a FOUR book set with each book sold separately. The ISBNs are: 1887560319, 1887560793, 1887560424 & 1887560068.
"The articles which compose the body of the following pamphlet, were originally published as leading editorials in the North America."--Introductory note